Not a lot to report on the layout itself, but it had been a while since I've updated the blog...
While I haven't fully made the decision to build the layout here (although I'm leaning heavily in that direction again...and might move a door to make some more room), I have been to a few ops sessions.
The layouts are of a variety of sizes and in various states of completion. What I've learned so far is that the size of the layout is of some relevance, but the sessions all tend to last about the same amount of time. The real key is understanding the limitations of the layout: How many people can run trains at once, and how many people are needed to run all of the trains? These two questions are slightly different.
How Many People Can Run Trains At Once?
This is affected by several factors. The amount of space for operators, as well as the number of throttles are the two largest factors. This is usually not too big an issue, simply because the track plan also limits the number of trains that can be moving at once, and a smaller layout typically has fewer trains at a time.
How Many People Are Needed to Run All Of The Trains?
In general, some operators will run more than one train, while others will only operate a single train in a session. In most of the sessions I have attended, the local runs for pretty much the entire session. Through freights (which may have some work)and passenger trains have shorter runs, and a given crew will probably run several. The number of trains to run needs to be high enough to keep everybody occupied most of the time.
So what's different on a larger layout? Well, it depends on what "larger" means. One two of the larger layouts I've run, the track circles back in the same space. There are a number of stops along the way, and some hidden track as well. The track plan in both cases include a decent-sized yard, and the work there keeps one operator well occupied for the session.
One of these layouts is set up in a block system, and you run every train through your block, and pass it on to the next block to continue the run. The other one I have only run the local, but you basically follow your train around the layout. Both of these layouts had a similar "feel" to the smaller layouts I've run, just a little more space between the stops. The train size wasn't necessarily bigger.
The only layout that felt significantly different was significantly larger. Five people were assigned to manage the yard work. Once again, the local(s) seemed to take the bulk of the session to run. Through freights were limited to two stops, and went fairly quickly, but there were a lot of them. The major difference, though, was in the scale. Passing tracks were long, and what is a quick runaround move on a smaller layout takes some time. There is a lot more time for railfanning as you follow your train between towns, or stops if you are only making a few stops. In addition, the number of trains and the number of operators is significantly higher since there is a lot more space. This felt much, much different because of the difference in scale.
Among other things that I have learned:
-"Long" trains don't have to be that long. I believe the largest train I saw was 46 cars. Even on a large layout, that looked huge. It was also about as large a train that the yard could handle on one track.
-Short, unblocked trains can take as long to switch as a long blocked train. On smaller layouts you can extend the operations by sending out unblocked or partially-blocked trains.
-Facing point switching also extends the operations. If you are planning on a small layout, an urban area with a mix of trailing and facing point switching may be more interesting. On larger layouts mostly trailing point (or operating the locals as turns, where they switch only trailing points) can help from making the session too long. Even if you are freelancing, pay attention to prototype track plans. At the very least you need a long enough siding to drop cars and runaround the train. But you may need at least one additional siding to facilitate splitting the train if needed without fouling the main.
-Two-way sidings can also extend operations. This means that there is a stub-ended siding in both directions off of one turnout. This gives you both a trailing and facing point turnout, but can also make switching moves more interesting since cars at the end of one of the sidings may limit how many cars you can move at once on the other.
-It's OK to make people wait. You want to have some work for just about everybody early on, but during the session it's OK for them to have to wait for the yardmaster to build a train. This gives the operators time to talk, railfan, and admire the layout. Just try to keep it so that no one person is hanging around too much.
Another tip is that it's a good idea to have somebody familiar with the layout responsible for the yard and the local. I'm still a big fan of two-person teams, and you can have one novice and one experienced operator on a team.
So, while I'm still in planning mode, operations has become the biggest consideration. That may affect which portion of New Britain I model if I have to reduce the size. I'd like to keep the operations to a minimum of four people. The two local 44-tonners will occupy two, and one person or team could be managing most of the other trains. I would manage staging, which most likely will include the Berlin line trains to local businesses and the Whiting Street yard. If I'm lucky, I can move another door which will give me a location to build staging that will not be under the other decks. I'll have to see how the geometry will work...
New Britain Station Main Site
Friday, March 21, 2008
Saturday, March 8, 2008
Planning the 'mini' layout
I've been working on the plans for what I'm calling the mini-layout. This is because we'd still like to move in the relatively near future, hopefully with a room of an appropriate size for the layout I'd like to do.
One of the nice things about the mini-layout is that I have a lot of what I'll need to get it operational in short order.
Assumptions
Operations will be based on autumn 1951, second trick.
The maximum train length, based on the sixe of the layout and particularly staging will be about 20 forty-foot cars, plus locomotive and caboose. I might consider expanding this to about 25 cars or so, depending on how the plan comes out.
The Berlin line (and thus the Whiting Street yard) are offline.
All staging will be stacked in a single location allowing access from outside the scenicked portion of the layout. Thus staging will be hidden from the operators, but the design allows the person operating the staging to see the whole layout.
Operations
By focusing on a single trick, I can identify what I will need to roster in the short run. The trains that will run during a typical session are:
OA-4 May pick up and drop off.
446
HDX-5 Drops off and picks up, could return later in the trick.
131
AO-3 Drops off and picks up.
YN-3 Does not drop off or pick up.
157
Operators would be:
Staging
Local Switcher person/team
HDX-5 person/team
All other trains team
The person operating staging could conceivably run the through trains. The time between trains would be spent shuffling trains in staging.
RosterThe nice thing about this schedule is that I already have a good portion of the roster needed, for example:
(3) DERS-2b (RS-2) locomotives (I need 2)
(2) DERS-2c (RS-3) locomotives (I need 1)
(1) DERS-1b (RS-1) locomotive (I need 1)
(1) DER-1 (DL-109) locomotive
(1) DEY-3 (S-1) locomotive
(2) DER-2 (FA-1/B/A) locomotives (I need 2 FA-1s)
I will probably have the DERS-2b and DERS-2c by the end of the month. The DERS-1b is readily available. So the only challenge I have is finding more FA-1 locomotives.
I have all of the hacks already or on order. The only thing that will be difficult is the light weight passenger cars, simply because there is no model available. I'll need about 4 to start, but can substitute heavyweights in the meantime.
Construction
I'm still working out the details of the exact plan. Bill Schneider built his in sections on foam at his dining room table. I like that idea, not just because it makes construction easy, but a semi-modular approach means that I can move portions to the next layout. The only potential issue is the clearance needed when using 2" foam instead of plywood or OSB. Another factor is grades, but if I build the grades by simply tilting the foam, then the same base can be reworked for a level design in the future. The grades will probably be necessary for staging.
The final decision is whether or not I want to tackle a helix. My concept (particularly for staging) could be problematic due to the necessary location of the helix if I use one.
One of the nice things about the mini-layout is that I have a lot of what I'll need to get it operational in short order.
Assumptions
Operations will be based on autumn 1951, second trick.
The maximum train length, based on the sixe of the layout and particularly staging will be about 20 forty-foot cars, plus locomotive and caboose. I might consider expanding this to about 25 cars or so, depending on how the plan comes out.
The Berlin line (and thus the Whiting Street yard) are offline.
All staging will be stacked in a single location allowing access from outside the scenicked portion of the layout. Thus staging will be hidden from the operators, but the design allows the person operating the staging to see the whole layout.
Operations
By focusing on a single trick, I can identify what I will need to roster in the short run. The trains that will run during a typical session are:
OA-4 May pick up and drop off.
446
HDX-5 Drops off and picks up, could return later in the trick.
131
AO-3 Drops off and picks up.
YN-3 Does not drop off or pick up.
157
Operators would be:
Staging
Local Switcher person/team
HDX-5 person/team
All other trains team
The person operating staging could conceivably run the through trains. The time between trains would be spent shuffling trains in staging.
RosterThe nice thing about this schedule is that I already have a good portion of the roster needed, for example:
(3) DERS-2b (RS-2) locomotives (I need 2)
(2) DERS-2c (RS-3) locomotives (I need 1)
(1) DERS-1b (RS-1) locomotive (I need 1)
(1) DER-1 (DL-109) locomotive
(1) DEY-3 (S-1) locomotive
(2) DER-2 (FA-1/B/A) locomotives (I need 2 FA-1s)
I will probably have the DERS-2b and DERS-2c by the end of the month. The DERS-1b is readily available. So the only challenge I have is finding more FA-1 locomotives.
I have all of the hacks already or on order. The only thing that will be difficult is the light weight passenger cars, simply because there is no model available. I'll need about 4 to start, but can substitute heavyweights in the meantime.
Construction
I'm still working out the details of the exact plan. Bill Schneider built his in sections on foam at his dining room table. I like that idea, not just because it makes construction easy, but a semi-modular approach means that I can move portions to the next layout. The only potential issue is the clearance needed when using 2" foam instead of plywood or OSB. Another factor is grades, but if I build the grades by simply tilting the foam, then the same base can be reworked for a level design in the future. The grades will probably be necessary for staging.
The final decision is whether or not I want to tackle a helix. My concept (particularly for staging) could be problematic due to the necessary location of the helix if I use one.
Thursday, February 28, 2008
Standards and Better Modeling
I'm in the process of modifying a Bowser model as a 117000-series covered hopper. I also have two different Eastern Car Works models of the same prototype. I received one of them today, and it's not quite the right one as it doesn't have the open sides. Looking more carefully at the picture on eBay it would appear that's the case for the second one as well. (Update: I received it today, it's for a completely different prototype).
It's OK in any event, because the details are a little too large compared to the Bowser one. It appears that the ECW kit is an older-style kit. It's still pretty nice, and its construction is quite different. I like to see different options like this, because I know I'll have to scratch-build some cars in the future and it helps to see some variations in the design of the models.
I also received an Eastern Car Works model of a 90-ton depressed flat car (17050-series or 17060-series). It also looks like an older kit in most of the detail, but it is well detailed. I will probably use the frame and some of the other parts, and scratch-build or use replacement parts for the details. It is certainly a closer match than anything else that's currently available.
I am also continuing to work on a B&O M26D boxcar from Speedwitch. The 17200-series flat from Speedwitch is simply waiting for trucks and couplers, painting and decals.
In addition, I've been working on that turnout and track options, and I've been studying pictures of locomotives and comparing them to the models I have.
All of this has worked to help set, as well as increase the level of the standards I'd like for the models on the layout. On the 17200-series flat I have all of the brake details except the release rod, simply because I haven't been able to determine where it should be in the few pictures that I have. Because of the quality of the model, as well as my own experimentation, I've set a high standard to start with.
But, it could be higher. I noticed that on the Protowest model of the 17300-series flat that there are rivets on the caps on the crossbearers. These rivets aren't on the model I have of the earlier series of flats. In fact, I thought these were simply "I" beams, and thus wouldn't have rivets. Because I had used some of the styrene included in the kit for some other details, I was potentially short for the covers. In the instructions, the crossbearer caps were glued across the top of the center beam caps. I cut them to size instead.
So here's the question: who cares if there are rivets on the bottom of a car?
Well, obviously the folks at Protowest. Although at this point I'm probably already being labeled as a "rivet counter," I really just want to make the best model I can, within the limits of my modeling ability and the reasonably avaialble resources.
Actually, I do want to stretch my abilities, and work just beyond my capabilities as much as I can, so I can get better. But I also want to set some standards across the models, so they will blend together as a cohesive whole once they're on the layout.
At this point I've come to the conclusion that I want to model the brake gear on each car. I'm planning on a fairly high layout level, and the brake detail can also be seen to be present in pictures. Because of my desire for consistency, I want these models to be up to the same standards as models I build a few years from now.
However, my skills at this point aren't quite at the level I'd like. So instead, I'm working my way through the process rather slowly at times. The B&) M26D is a good case in point. I started it about a year ago. After completing a good portion of the underframe (but not the brake gear) I found that it wasn't going as smoothly as I'd hoped. For one thing, I didn't read the directions closely enough. But more importantly, I hadn't learned enough about what I was modeling, nor how to model it.
While that sat waiting, I worked on several other kits, all F&C kits. One is the New Haven milk car kit, which I am pretty close to completing. The reason it hasn't been finished is partially due to learning that it would have been long gone by my era. So it's waiting for trucks and couplers, as well as a final painting and decals. The other two are both NHRHTA Kit #1. However, these kits were manufactured in different runs, and are very different kits. One has a cast roof that is simply applied to the model. The other has a roof that's cast in one piece. You are supposed to bend (break) it in half, and form it over the model using another casting that helps set the correct angles. While both kits are a yellowish resin that F&C used at the time (their resin is now white), the earlier of the two was a much stiffer, almost brittle resin. The flash was much thicker and required a lot of sanding to clear up, and the sides are very, very warped. If this was what all craftsman kits were like, I might have second thoughts about my plans.
I'm not sure if I'll "finish" any of these cars. Along with a small collection of Accurail cars, etc. However, they have served their immediate purpose, which is to provide some much needed practice and experimentation. It was enough so that when I got around to the 17200-series kit that I was able to complete it fairly quickly, and without too much difficulty. The M26D is also closer to completion, now awaiting the purchase of a few parts recommended to make it a more accurate model.
Which brings me back to my original thought: my modeling standards. It's easy enough to list what I think I want:
-Separately applied grabirons and ladders
-Metal Sill Steps and other fragile parts where possible
-Accurate doors, roofs, and ends
-"Complete" brake gear, including piping to all 5 junctions on the AB control valve
-Sergent Couplers
-Proto:87 Wheelsets
-Date specific painst schemes and decals
The list will continue, but the point is that these are my standards. They're pretty high standards to meet, especially when considering a 500-piece collection of rolling stock. The cost of each piece increases, in part because it moves me toward resin kits as the primary type of rolling stock, as well as additional cost for extra or replacement details, and small run parts like the couplers and wheelsets.
But in the long run it may save me time, money and aggravation. My theory is that if I set the standards high now, I won't have to go back and "correct" earlier models and bring them up to standard. In some cases I may skip certain details (such as super-detailing a locomotive) when I can put the money toward something else. But overall it will be less expensive to make sure each item is up to standard before putting it on the layout.
It is possible that a few years down the road I could decide that this is crazy and lower some of my standards. THe only ones that would have an appreciable effect financially is deciding to switch from Sergent couplers, or Proto:87 wheelsets. If I decide to do less brake detail it just means that the older models will have more detailed underframes.
But I don't think that's likely. Knowing my own tendencies, I will only want to improve the level of detail above even these standards. I also feel that the more cars I assemble, the more proficient I will get, and it will go faster and with fewer mistakes.
Ted Culotta in a clinic last year said that it's important to not to overthink things and not get anything accomplished as a result. I agree, it's important to keep working because after all, it's just a hobby. If I chop up a locomotive and it doesn't come out the way I'd have hoped, then I can either try to fix it, or replace it. Let's face it, I've wasted money on far less. If I was collecting $1,500 brass locomotives it might be another story...
So far I've sacrificed two layouts, a handful of shake-the-box kits, a couple of resin kits, and some of my time. So far I have a little to show for my efforts. I'm betting that as my skills improve, there will be more on the shelf (or layout) to show for my efforts than what I have so far.
So don't be afraid to set your standards high. The key is to keep working towards them. I have a small shelf's worth of partially completed models. But I also have what I feel is one really good model, with another two well on their way. And I feel much more confident that the next kits I work on will be the same.
If I'd originally decided that building a large roster quickly with shake-the-box kits was the best approach, then I'd not only be re-purchasing a bunch of parts (couplers and wheelsets for one, of which I did buy a few McHenry and Intermountain already), but I'd also have a lot more models that would be pushed off of the layout as "not good enough anymore." Bill Schneider has reached a point where he removes one model from the railroad each time he adds one. But he's at that 500+ car roster stage where it's more a necessity due to space constraints. When I get to that point I want to have a difficult time deciding which model to remove.
Thursday, February 21, 2008
Update
Well, I've been sketching out some rough ideas for the new layout, and I think I know which version I plan on building. If I stick with the "simple" around-the-room helix, with the east and west Highland Line running in opposite directions, when they circle around to the staging area I can simple run the mainline down the middle of the staging area, creating the contiuous loop for running. On one side of the main will be the staging/storage for Hartford, and Waterbury on the other. My current benchwork is about 3" thick, and I'll add another inch or so for lighting the staging area. At a steady 2% grade I'll have about 10" minimum additional clearance, which I think will work well for staging. I will hide the staging from the operating location in the center of the room with doors, but it will be open on the staging side for easy access.
While the "double" helix created will be a little more difficult to build, it shouldn't be too bad. I plan on using the masonite spline method inspired by Joe Fugate and the method I used for the current layout. All of the flat sections (including the Stanley Works section which will be on a 1% grade) will use a simple table-top construction. I may just use OSB for the table-top, or I may decide to go with the foam.
All of the "tunnels" will be hidden behind buildings, and the staging will be completely hidden from the operators. I may or may not hide the Berlin Line as it ascends behind the eastbound Highland Line into staging.
The swing-open section will comprise track on several different levels, and will be 4 tracks wide. I will stagger the rails and use guardrails to help prevent derailments, and I'll use electrical contacts to create dead sections of track when the door is not shut properly. It will essentially be a half-height door with sections of track attached to the back of it.
I will have to work out the staging layout for maximum storage. At the end of each storage section I will install an inexpensive, manual Atlas turntable to allow turning of locomotives and cars as well as an escape track. I can create gantlet tracks to access the turntable to allow as many as possible. This will turn the stub-ended staging into a virtual double-ended staging. The alternative would be a transfer table.
While the "double" helix created will be a little more difficult to build, it shouldn't be too bad. I plan on using the masonite spline method inspired by Joe Fugate and the method I used for the current layout. All of the flat sections (including the Stanley Works section which will be on a 1% grade) will use a simple table-top construction. I may just use OSB for the table-top, or I may decide to go with the foam.
All of the "tunnels" will be hidden behind buildings, and the staging will be completely hidden from the operators. I may or may not hide the Berlin Line as it ascends behind the eastbound Highland Line into staging.
The swing-open section will comprise track on several different levels, and will be 4 tracks wide. I will stagger the rails and use guardrails to help prevent derailments, and I'll use electrical contacts to create dead sections of track when the door is not shut properly. It will essentially be a half-height door with sections of track attached to the back of it.
I will have to work out the staging layout for maximum storage. At the end of each storage section I will install an inexpensive, manual Atlas turntable to allow turning of locomotives and cars as well as an escape track. I can create gantlet tracks to access the turntable to allow as many as possible. This will turn the stub-ended staging into a virtual double-ended staging. The alternative would be a transfer table.
Wednesday, February 20, 2008
More Modeling
Well, it appears that I'll be doing a bit more than I anticipated...
Models
First, since I needed a couple of small supplies, I decided to check out another hobby store I "found." Pretty much every hobby store is about 45 minutes or more from me at this point, so I thought it would be nice to check out something new. As it turns out, this one appeared to be in somebody's house, and when we tried to call there was no answer. So, no hobby store. But we were close to the MA border by that point, and it would have been more than an hour to get down to Wolcott and the Hobby Gallery (the only hobby store "nearby" that has detail parts in stock).
So we decided try Tucker's Hobbies in Warren, MA. Everybody kept telling me I had to go check it out. Although it wasn't quite what I expected, they had a great supply of detail parts in stock. So it was a trip worth making, although I'll have to plan ahead, and perhaps call in an order before I head up that way again, since it's over an hour. I always seem to forget to order something, and it appears they are the most likely to have what I need in stock.
I also picked up a Bowser covered hopper. So I'm making some modifications to bring it up to the approriate level of detail. I've decided I much prefer to work on a craftsman-style kit than to scrape parts off of an existing model. There is an Intermountain model in pre-production right now that looks great, although I'll need to make a few modifications to that as well, it appears.
I also have one of the Eastern Car Works depressed center flat cars on the way. This will be a good starting point for either a 17050- or 17060-series flat. It's a model of a 36'-long car, and the prototypes are 36'8" and 37'6" respectively.
I still plan on ordering a model for a 17300-series flat as well, either the Sunshine or Protowest one. So I'll be working on completing some of the less common cars on the roster.
I also picked up one of the Athearn RS-3 locomotives. It's a nice model, although there are a number of modifications to make. One area that needs work is the plow, and I think the Atlas one is a bit more accurate in this regard. I'm working on a closer study of both to identify the differences between them, as well as the accuracy. I don't have an Atlas one yet, but I may pick one up if I can't discern what I need in the pictures. Note that the Atlas one is not currently available in a New Haven paint scheme, and has not been released in the delivery scheme at all.
LayoutI'm working on a new plan for the layout, again. Our planned move may not happen as soon as we thought, due to a few complications, so I'm going to start working on a new layout here. We've also decided to stop pretending that we're going to use the basement for other uses, so I'll have a full 10' x 20' area to work with, plus another small area if need be.
While I've still considered a multi-level layout, I want to avoid a crawl-under design. I'll need to provide some sort of a lift-out or door to access the center of the room, since that is the operating section of the layout. So the current plan is to model the station/arcade area, and the Highland Line west through Stanley Works. All three of the lines (Highland east & west, and the Berlin line) will go to semi-hidden staging. The Berlin line will be at the same level as the main layout, hidden in the Stanley Works buildings. There will also be a semi hiddne track that completes a loop for continuous running. The remaining staging will be beneath the layout, but doesn't have to be low enough for scenicking. The lower level staging will also complete a loop for continuous running.
The Berlin Line will complete a continous running line around the top level only. The Hartford/Waterbury line will complete a longer run for continuous running utilizing the second level, so the trains will be passing a different intervals. I can also allow slow trains to run through this loop while running alone, while doing the local switching.
I'll still need to do a 2-level entrance of some sort, but the staging doesn't have to be at as low a level, nor will it have as many tracks crossing the opening. How I get the trains to the lower level is the question right now. I'd like to stick with a maximum of about a 2% grade. I would prefer to avoid a helix, partially due to the reduced radius and increased grade as a result. But the bigger factor is that the lines that enter the helix are both double-tracked main, which complicates things more.
So my next option is an around-the-room helix.
Version one of the around-the-room helix gives me the most room to work with for the lower level staging in the location I want. The problem is that the two mainlines are decending in the opposite directions, and each will need to circle the entire room once. This again makes things a little more complicated.
Version two is a turnback on one of the mainlines, so both tracks can descend side-by-side. In addition, I could reduce the trackage to a single double-tracked main, instead of having it 4 tracks wide. The only real problem with this design is that the turnback is over the location where I want the staging, reducing access slightly, or the length of the tracks. In addition, I have to add a second loop under the turnback to maintain continuous running. The turnback and loop would both extend outside of the layout room itself, so it will not interfere with the rest of the layout or operation.
The only major difference that this layout will have from my intended layout is that it will not feature the Berlin Line at all. All traffic to the Berlin Line will be handled off-layout by the dispatcher (usually me), and the Hartford/Waterbury staging will be immediately below that so all off-line activity will happen in one place (which is outside the main operating section of the layout, and hidden from their view).
I expect that I will still have at least 3 jobs plus the dispatcher, that could potentially support 3 two-person teams:
The yard switcher. One of the local 44-tonners that handles the switching on the Highland Line.
HDX-5. This is the only local freight, and will also switch the same industries as the yard switcher.
Through trains. This includes passenger and freight. All of the Hartford-based or bound trains will dropp off and pick up cars here.
The dispatcher will move cars "dropped" at the Whiting Street Yard by the New Haven trains to the Commercial Street Yard. He will also pick up cars dropped there by trains bound for Berlin Line industries. He is also responsible for all trains entering or leaving staging, and will switch locomotives and hacks to their new trains to ready them to enter the layout.
The center aisle will be somewhere between 30" and 60" wide, depending on how I decide to model the PF Corbin factory on Myrtle Street.
Sketches and details to follow, and I hope to start building the benchwork relatively soon (and reuse as much of the existing benchwork as possible). The method of constructing the benchwork is still undecided as well, although I'm leaning towards re-using as much of the OSB that I used for the last layout, along with foam and homasote or cork roadbed.
Models
First, since I needed a couple of small supplies, I decided to check out another hobby store I "found." Pretty much every hobby store is about 45 minutes or more from me at this point, so I thought it would be nice to check out something new. As it turns out, this one appeared to be in somebody's house, and when we tried to call there was no answer. So, no hobby store. But we were close to the MA border by that point, and it would have been more than an hour to get down to Wolcott and the Hobby Gallery (the only hobby store "nearby" that has detail parts in stock).
So we decided try Tucker's Hobbies in Warren, MA. Everybody kept telling me I had to go check it out. Although it wasn't quite what I expected, they had a great supply of detail parts in stock. So it was a trip worth making, although I'll have to plan ahead, and perhaps call in an order before I head up that way again, since it's over an hour. I always seem to forget to order something, and it appears they are the most likely to have what I need in stock.
I also picked up a Bowser covered hopper. So I'm making some modifications to bring it up to the approriate level of detail. I've decided I much prefer to work on a craftsman-style kit than to scrape parts off of an existing model. There is an Intermountain model in pre-production right now that looks great, although I'll need to make a few modifications to that as well, it appears.
I also have one of the Eastern Car Works depressed center flat cars on the way. This will be a good starting point for either a 17050- or 17060-series flat. It's a model of a 36'-long car, and the prototypes are 36'8" and 37'6" respectively.
I still plan on ordering a model for a 17300-series flat as well, either the Sunshine or Protowest one. So I'll be working on completing some of the less common cars on the roster.
I also picked up one of the Athearn RS-3 locomotives. It's a nice model, although there are a number of modifications to make. One area that needs work is the plow, and I think the Atlas one is a bit more accurate in this regard. I'm working on a closer study of both to identify the differences between them, as well as the accuracy. I don't have an Atlas one yet, but I may pick one up if I can't discern what I need in the pictures. Note that the Atlas one is not currently available in a New Haven paint scheme, and has not been released in the delivery scheme at all.
LayoutI'm working on a new plan for the layout, again. Our planned move may not happen as soon as we thought, due to a few complications, so I'm going to start working on a new layout here. We've also decided to stop pretending that we're going to use the basement for other uses, so I'll have a full 10' x 20' area to work with, plus another small area if need be.
While I've still considered a multi-level layout, I want to avoid a crawl-under design. I'll need to provide some sort of a lift-out or door to access the center of the room, since that is the operating section of the layout. So the current plan is to model the station/arcade area, and the Highland Line west through Stanley Works. All three of the lines (Highland east & west, and the Berlin line) will go to semi-hidden staging. The Berlin line will be at the same level as the main layout, hidden in the Stanley Works buildings. There will also be a semi hiddne track that completes a loop for continuous running. The remaining staging will be beneath the layout, but doesn't have to be low enough for scenicking. The lower level staging will also complete a loop for continuous running.
The Berlin Line will complete a continous running line around the top level only. The Hartford/Waterbury line will complete a longer run for continuous running utilizing the second level, so the trains will be passing a different intervals. I can also allow slow trains to run through this loop while running alone, while doing the local switching.
I'll still need to do a 2-level entrance of some sort, but the staging doesn't have to be at as low a level, nor will it have as many tracks crossing the opening. How I get the trains to the lower level is the question right now. I'd like to stick with a maximum of about a 2% grade. I would prefer to avoid a helix, partially due to the reduced radius and increased grade as a result. But the bigger factor is that the lines that enter the helix are both double-tracked main, which complicates things more.
So my next option is an around-the-room helix.
Version one of the around-the-room helix gives me the most room to work with for the lower level staging in the location I want. The problem is that the two mainlines are decending in the opposite directions, and each will need to circle the entire room once. This again makes things a little more complicated.
Version two is a turnback on one of the mainlines, so both tracks can descend side-by-side. In addition, I could reduce the trackage to a single double-tracked main, instead of having it 4 tracks wide. The only real problem with this design is that the turnback is over the location where I want the staging, reducing access slightly, or the length of the tracks. In addition, I have to add a second loop under the turnback to maintain continuous running. The turnback and loop would both extend outside of the layout room itself, so it will not interfere with the rest of the layout or operation.
The only major difference that this layout will have from my intended layout is that it will not feature the Berlin Line at all. All traffic to the Berlin Line will be handled off-layout by the dispatcher (usually me), and the Hartford/Waterbury staging will be immediately below that so all off-line activity will happen in one place (which is outside the main operating section of the layout, and hidden from their view).
I expect that I will still have at least 3 jobs plus the dispatcher, that could potentially support 3 two-person teams:
The yard switcher. One of the local 44-tonners that handles the switching on the Highland Line.
HDX-5. This is the only local freight, and will also switch the same industries as the yard switcher.
Through trains. This includes passenger and freight. All of the Hartford-based or bound trains will dropp off and pick up cars here.
The dispatcher will move cars "dropped" at the Whiting Street Yard by the New Haven trains to the Commercial Street Yard. He will also pick up cars dropped there by trains bound for Berlin Line industries. He is also responsible for all trains entering or leaving staging, and will switch locomotives and hacks to their new trains to ready them to enter the layout.
The center aisle will be somewhere between 30" and 60" wide, depending on how I decide to model the PF Corbin factory on Myrtle Street.
Sketches and details to follow, and I hope to start building the benchwork relatively soon (and reuse as much of the existing benchwork as possible). The method of constructing the benchwork is still undecided as well, although I'm leaning towards re-using as much of the OSB that I used for the last layout, along with foam and homasote or cork roadbed.
Subscribe to:
Posts (Atom)