In October a Sperry Car was run up the industrial branch in Terryville/Bristol. Several sections were identified as wide gauge, and I helped with the track work. The track arrangement is interesting and would be very easy to modify into a small shelf layout with a lot of operational interest.
Here's an overview of the location. The branch is a long climb up a pretty good grade. There are several grade crossings, bridges, and an old freight house. But the industries served are at the end of the line.
Right past the grade crossing is a switch. Beyond that is a second switch. This is looking back toward the grade crossing.
This is looking the opposite direction, standing in the switch closest to the road.
The track on the left is one leg of a runaround. The left leg of the switch that is visible in the photo is the other leg of the runaround. The right track main track, that continues to the next industry.
This is taken from just past the switch in the photo above. The two tracks to the left go down a pretty significant grade to that industry.
Those two tracks converge at the bottom of the hill. The track continues as a lead for a switchback to the industry.
Only a portion of the lead is still maintained, with the rest going into the woods. It's clear that part hasn't been used in quite some time.
It continues for another 200+ feet to an old Hayes bumping post.
The track that is maintained is plenty long enough. That industry is no longer served by rail, so this is only used as a runaround track. It only needs to be long enough for the locomotives now.
The rail on this particular track is 105 lb Dudley rail from Bethlehem Steel and rolled in 1924 for the Lackawanna. "Dudley" is the last name of the NYC engineer that designed this specific rail profile.
I didn't measure it, but they are probably 33' lengths since 36' gondolas were more common in that era. Other rail in this section include 100 lb, 107 lb, and 110 lb NH rail. There's also still a lot of 30' rail around here. Mostly 78/79 lb rail, but a lot of the 100 lb rail too. Maybe some of the 107 lb as well, I don't recall.
A lot of it is in 30' or 33' lengths, not the 39' lengths that many modelers believe is "standard." It was a standard, but when a given railroad adopted it varied, and they didn't discard the older, shorter rail.
The NH probably didn't switch to 39' lengths until around 1929, when they received their first 40' gondolas. While other roads had longer gondolas and rail could have been delivered to the New Haven in them, they would want to use NH cars for moving them for track work. And the MOW gondolas were older 36' cars for quite a bit longer than that. So they may have switched even later to the longer rail.
Regardless, it was the he Shoreline, Springfield or Maybrook lines that would receive new, heavier rail. The old rail would be reused on other lines. The Highland Line was still 78/79 lb rail in the '20s, but received 107 lb rail by the '40s. It was older 30' or 33' rail pulled from those heavier-trafficked lines. A lot of that rail is still in service today.
The whole thing is still on a grade. This is probably a good 15-20 feet below the main track. There are other interesting details to model such as the small pool near the track here. That's an old switch stand thrown to the side, too. This is the switch to the industry.
The industry track is pretty long.
That's because there's quite a bit of grade separation between the industry track and the runaround track.
In fact, all three tracks are at different levels as you can see looking at the two runaround tracks here.
Obviously, on a model railroad you'd probably have this industry still served by rail. But even now, when it's not, these tracks get regular use. The train comes up the grade and pulls into the upper track. The locomotives disconnect and runaround, fouling the crossing in the process. They then have to pull the cars back, fouling the grade crossing again. This is because the industry at the end of the line is served by all facing point switches.
It would be easy to align the industry at the end differently to fit a small layout. With both industries served there would also be plenty of work for a crew to stay busy for a while. All the grade separations provide a lot of visual interest. The industry at the end of the line receives tank cars and coil cars, and the other one used to receive box cars. But any industries could be added. Across the street there is a space that, at least at one point, was potentially going to be a propane dealer.
On a model, you would most likely level out the runaround track to make it easier to operate. But consider the amount of time it takes here. Because the track is on a grade, the crew has to set several hand brakes prior to detaching from the train. After the locomotives run around, those hand brakes need to be released. All of this takes much longer than we often allow when operating a model railroad.
We had to wait until the train came through to continue our work one day.
I also took a video of it on its way through Forestville. You can see the cars on the head end that were coming up the line.
.jpeg)













No comments:
Post a Comment