A tour of Harvey's layout:
New Britain Station Main Site
Tuesday, May 20, 2014
Saturday, April 12, 2014
Scenery
I really need to get to some posts. But here's a revisit to the same location as the last post, the logging line on Harvey's layout. Joseph (and his Mom!) have both been helping at Harvey's. We've been making a lot of puffball trees, and working on the scenery. Joseph did the trees and some of the scenery here, including installing the rock casting above the portal. I completed more of the scenery, including my first attempt at hand carving Sculptamold rocks. I'm really happy with the way they've come out, and pretty happy with how they blended into the rock mold.
Thursday, February 20, 2014
Saw Mill
A saw mill? In New Britain!?!
Well, not quite. I'm helping work on a layout for Harvey and he's said that I can include his layout on the blog. So today I'm working on the saw mill. Here's the start of day picture:
I'll provide more details about the layout later, but I built a good portion of these mountains and installed this siding. Since I had started basic groundcover, John thought we should figure out how to install the saw mill, as this is the logging line.
Harvey bought the mill after it had been cut out from another layout. It's a nice scratchbuilt structure, and half of the roof was left off to allow you to see the detail. So we wanted to make sure that side faced the aisle. The problem was that side originally faced the siding. It just fit behind the siding here, but since it's fairly high it made it difficult to see. So I tried it in a few places on this side of the track and we decided to add some foam to the terrain to give it a home. As you can see, John also added a road to the location and up between the mountains.
I built a retaining wall the night before, and here I'm filling the spaces with grout:
I had started by making a 'template' with what was handy, a piece of newspaper. Initially I was going to transfer that to some other material, but decided it would work just fine as backing. I used The Chopper to cut all of the small pieces then just glued it together. After brushing the grout into the spaces I used diluted white glue to set it while I worked on the hill.
Going back a day, here was the hole I cut in the hill and the piece of foam that was made to fit with the rough placement of the mill:
So I spent the day doing basic groundcover (more grout), decided that the road would stand out more as gravel instead of a dirt road, and installed the retaining wall. The gravel road was a blend of the grout, light gray ballast, and cinder ballast. It will be a lighter color when dry.
There's a lot more work to do, but I did figure out one other thing. I was trying to figure out something to put in the space between the siding and the mainline, partially as justification for the siding to be swung so far out and for them to build the mill on the edge of a cliff. While I was working on it it came to me - a water tower. For that matter, some basic railroad maintenance sheds, etc. for servicing the Shay. This is really the only location where they'll fit. So I think I may try my hand at scratchbuilding them because I'd like them to match the quality of the nearby mill.
Labels:
Layout construction,
Scenery
Location:
Roxbury, CT, USA
Monday, January 20, 2014
Chris Adams Ops Session
Wow. Two posts in one night. Here are some photos from the Second Official Valley Line Ops Session. Due to some technical difficulties I couldn't get these posted until now.
I wasn't running trains this time. I helped get things started, and experimented with a few photos before helping out upstairs for the Photo Library Night that was happening at the same time.
I wasn't running trains this time. I helped get things started, and experimented with a few photos before helping out upstairs for the Photo Library Night that was happening at the same time.
Labels:
Layout Visit,
Operating Session
Location:
Old Saybrook, CT, USA
Dave Ramos Ops Session
Chris, Pieter, John, Tom, and new buddy Jim Schweitzer drove down to NJ for an ops session at Dave's place with a much larger crew. Dave's modeling Manhattan in 1947 and it's a really unique layout.
Or really, layouts. I'll give a brief description, but there's a ton more information about NYC railroads at Industrial and Offline Terminal Railroads of Brooklyn, Queens, Staten Island, Bronx and Manhattan.
The Erie and Lehigh Valley Yards are covered on the site in detail, the High Line and NYC Yard are not.
Chris, Craig Bisgeier and I were operating the NYC West 33rd Street Yard. It basically operates as an independent layout of its own, with freights terminating in the yard. All of the freight is handled at several industries right around the yard, a freight house and REA terminal. We usually had two switchers doing the work of breaking apart and building the freights. It's a cool operating scheme with waybills, cars sit for a minimum time as listed on the waybill and managed by the fast clock. There's also a cleanout track and cars are left a minimum amount of time based on an egg timer.
Part of the job Chris was handling was servicing the Terminal Stores building. This building is adjacent the Erie Railroad West 28th Street Yard that in Dave's basement is a standalone island in the middle of the room. This yard is served by car float. The Erie also services the Terminal Stores building, and the NYC crosses the tracks from the Erie car float to the Erie yard.
On another standalone section is the Lehigh Valley West 27th Street Yard. This is another entirely independent layout other than the fact that the LV also services the Terminal Stores building.
I didn't take a good shot of the LV yard, but in the picture above it's behind and to Chris's right.
There is no interchange at all between NYC, Erie, or LV, they just service the Terminal Stores building independently.
The fourth section of the layout is the High Line, which passes over the NYC West 33rd Street Yard and continues around the entire room. The High Line terminates at the St John's Park Terminal inside a large building.
Or really, layouts. I'll give a brief description, but there's a ton more information about NYC railroads at Industrial and Offline Terminal Railroads of Brooklyn, Queens, Staten Island, Bronx and Manhattan.
The Erie and Lehigh Valley Yards are covered on the site in detail, the High Line and NYC Yard are not.
Chris, Craig Bisgeier and I were operating the NYC West 33rd Street Yard. It basically operates as an independent layout of its own, with freights terminating in the yard. All of the freight is handled at several industries right around the yard, a freight house and REA terminal. We usually had two switchers doing the work of breaking apart and building the freights. It's a cool operating scheme with waybills, cars sit for a minimum time as listed on the waybill and managed by the fast clock. There's also a cleanout track and cars are left a minimum amount of time based on an egg timer.
Switching out the cleanout track.
Reefers at the cleanout track.
Anheuser Busch is the large building behind it.
The gons in this and the next picture are on the Steel Track.
The Steel Track will eventually have an overhead crane.
The track to the right of the Steel Track is a Team Track.
The track on the other side of the High Line is another Team Track.
The large building in the back is the Stanley Soap Co. served by its own track.
The track with the reefers is the Perishable Track.
The two tracks in front of that (that come together in front of the reefer)
are the Terminal Stores inbound/outbound tracks.
The two tracks in front of that are outbound tracks, with an inbound track off the picture in front of those.
A somewhat blurry picture of Chris taking a picture of the Erie Car Float.
In the background is the Erie Yard, and the large building beyond Chris's camera
is the Terminal Stores Building.
The NYC West 33rd Street yard is off camera to the left and connects to this section via a lift out.
The High Line can be seen around the perimeter of the room.
On another standalone section is the Lehigh Valley West 27th Street Yard. This is another entirely independent layout other than the fact that the LV also services the Terminal Stores building.
I didn't take a good shot of the LV yard, but in the picture above it's behind and to Chris's right.
There is no interchange at all between NYC, Erie, or LV, they just service the Terminal Stores building independently.
The fourth section of the layout is the High Line, which passes over the NYC West 33rd Street Yard and continues around the entire room. The High Line terminates at the St John's Park Terminal inside a large building.
St John's Park Terminal on Dave Ramos's layout.
Note that beyond the angled wall all of the tracks are inside the building.
On the back wall is the active staging that serves the entire layout.
All of these four sections operate independently.
Here are a few more pictures of the Erie West 28th Street Yard.
Overview of the Erie West 28th Street Yard.
The NYC West 33rd Street Yard is in the back right corner.
The NYC crosses left to right, Terminal Stores is to the right.
The two Erie tracks are to the car float.
I can't wait to get back down there and try one of the other layouts. Thanks Dave!
Labels:
Layout Visit,
Operating Session
Location:
Clifton, NJ, USA
Subscribe to:
Posts (Atom)
.jpg)










