Continuing with the DEY-3 models. Units 0971 and later were delivered with automatic shutter controls, while the earlier units had manual shutter controls. The Proto 2000 model comes with parts for the manual shutter controls. It's a small plastic part that mounts near the fan housing, and a long pipe that goes to the cab. There are starter holes inside the hood to drill out for this part. I didn't have a drill bit long enough so Chris drilled them out for me.
New Britain Station Main Site
Wednesday, July 26, 2023
NH DEY-3 (ALCo S-1) Part III: Shutter Control and Water Fill
Wednesday, July 19, 2023
NH DEY-3 (ALCo S-1) Part II: Shutters and Whistle
Friday, September 3, 2021
Power for the New Hartford Local
Chris has gotten started on building his undecorated Proto 2000 S-1 for a New Haven DEY-3 class switcher. I had started some modifications on mine a while ago, and we need to add decoders as well. So naturally, I pulled mine out to provide some input. Which has led to the locomotives hitting the bench for some more work.
So what locomotives will I need?
In my case, I need the S-1 for the New Hartford Local. Although I usually refer to this as HDX-5, it's a bit more complicated than that as things were changing throughout the era I model. For now I've decided to focus on 1949 and later since it will be easier to get the diesels running. Especially since HDX-5 used a K-1-d mogul with Southern valve gear, a variation that NERS never released (despite the initial announcement that they would). So until I'm comfortable I have the skills to modify the valve gear on a brass model I'll start with these.
1949
HDX-5 was briefly eliminated in early 1949 when the K-1-d was pulled, and the tonnage absorbed into NY-4 which would work the New Hartford branch on Monday, Wednesday and Friday.
Presumably there was enough traffic, perhaps combined with the fact that HDX-5 originated in Hartford instead of Cedar Hill, and it was reinstated by September, 1949 with DEY-3 (S-1) no. 0967 assigned. It was built on May 13, 1944.
John Wallace took this photo of 0967 on the Valley Local in Wethersfield in May, 1949.
1950-1951
In autumn of 1950, the assignment for HDX-5 has changed to DEY-3 0994. This is one of the postwar S-1s, the second to last one, and was delivered in Hunter Green and Warm Orange on January 1, 1949.
Chris found this undated photo of 0994 in Wethersfield. Looking closely, you can see the line between the green hood top and Warm Orange hood. The question is, which green?
In mid-'51 the NH started the Pullman Green/Warm Orange scheme that 0967 received in 1952. But in a document dated January 27, 1955, no. 0994 hadn't been repainted yet. At that time, the current scheme was 401 Green with Warm Orange, and a 90 degree fillet had been added at the top next to the cab. In other words, the "full balloon" or "hot dog" scheme. This scheme was replaced by the first Matter/McGinnis scheme on February 1, 1956. So it must have been the "full balloon" scheme.
Sure enough, here's a photo confirming this scheme:
This was the fourth scheme worn by these classes. I haven't found any record or photo showing that 0994 was subsequently repainted prior to the PC era either. There are some photos of DEY- class locomotives in these (very worn) schemes in the late-'60s so it's possible that neither 0967 or 0994 were repainted again.
I don't have any engine assignments for 1951 so for now I will keep 0994 on that assignment.
1952
In Spring of 1952 the New Hartford local and the Cedar Hill-Holyoke local were combined, operating out of Hartford. By September 1952 the New Hartford local is reinstated, now as NX-25 after the elimination of the Hartford Division. It still originates in Hartford, and has DERS-2b (RS-2) 0503 assigned. This is convenient, since it's one of the two locomotives regularly assigned to NY-4/YN-3 in earlier years and I've already modeled it.
I don't have any repaint information for 0503, but here's a shot in South Boston in another scheme:
This scheme, the same as noted for 0967, was applied from ~June, 1951 to ~June, 1953, and was the second scheme applied to RS-2s.
The diagram for the following "full balloon" scheme was dated for June, 1954, but it was noted as a correction, and photos indicate that the switch occurred earlier, probably mid-1953. So there's a possibility that 0503 would have the pictured scheme by late '52, but it could have been sometime in 1953 as well.
1953
In fall of 1953, NX-25 and NY-4/YN-3 are replaced by NX-28, but it now operated out of Plainville.
No 0967 is assigned to this train, but we know that 0967 was repainted in the above scheme on April 3, 1952 as noted above. But it doesn't work New Britain at all, which is one of the reasons there are no daytime freights in my November, 1953 ops sessions. This train, as NX-28, would switch back to originating in Hartford for fall of '54 and NY-4/YN-3 would also be reinstated by then. Tom McNamara caught DERS-3 (Fairbanks Morse H16-44) no. 590 on the job in that era.
All of these changes are beyond the operating sessions on the layout.
Repaints?
During this era, locomotive paint schemes were changing frequently, and those schemes help set the era. But not all of a given class received a particular scheme. Although I know 0967 was repainted by 1953, it doesn't look like it was operating in New Britain at that time.
As for 0503, that could have been repainted after November, 1952, the last year it will be running on the layout. At that time, there are a couple of DERS-2c (RS-3) locomotives, one of which will be in that scheme (and the other in one similar to the RS-2 delivery scheme, but Pullman Green and including a band of green along the bottom). So three different RS- paint schemes running at once if I stick with the delivery scheme on 0503. I do have a third model already disassembled, and I could do a second model if I wanted to. For the moment that will stay on the back burner unless/until I find documentation that it was repainted prior to November, 1952, and I'll get working on the S-1s instead.
Monday, April 26, 2021
HDX-5 in Newington and New Britain
I've been trying to maintain a steady pace of posts this year, but at the same time I am also rebuilding my website.
I built my current site on Google Sites. But like so many products and services Google has created, they have decided to end the old Google Sites and create an entirely new (and less flexible) product. Long story short, I've been rebuilding the site on the new Sites (after looking at alternatives), and I've taken the opportunity to essentially rewrite most of it as well. It needed it anyway.
When I get there, it has lots of new information, compiled information from the blog (that was the point anyway), and new photos too.
Since the new site is still some time off, here's a teaser. I've been working on the page for the New Hartford Local. Kent Cochrane photos, of course, c1947-8 unless noted.
K-1-d No. 423 with HDX-5 westbound at Newington Junction.
479 westbound with HDX-5 with a 15 car* train taken from Black Rock Bridge in New Britain.
*This is noted by Tom McNamara on the back of the photo, which comes from his collection. I count 11 cars. The date is also stamped on the back of the card, but it doesn't look like mid-October to me. All of the distant visible buildings on the north side of the track (to the left of the train) are part of Stanley Works.
The photo of 423 is great, because I could finish the K-1-d that I have since it has Baker valve gear. Since HDX-5 ran with steam until the end of 1948, it makes it easier to get it up and running. Then I can worry about how to fabricate the Southern valve gear for 479 in the future. Of course I'll still have to see if I can get it to haul 11 cars up the helix...




























