New Britain Station Main Site
Thursday, December 2, 2021
The Next Layer of Weathering
Tuesday, November 30, 2021
More Weathering Experiments
After the oils, I wanted to try to do a layer of soot and dust using the airbrush. Having never done this, I decided to start with tinting a clear coat with a little black. The idea being that not only will I add the layer of grunge that I want, but it will also seal the oils.
I also think that this had a slightly different effect than I was hoping, although subtle. It almost looks too even, to my eye. Overall I think it will be fine, but needs something else to make it less uniform. But I either need a lot more practice, or to find a different approach to get that overall layer of soot and dust I'm looking for.
With the oils, I was ready to get started on the actual model immediately. I'm glad I didn't as I work through further processes. I think I need to weather another scrap model (or a few) with oils for practice, but also so I can compare them side-by-side as I try other approaches layer by layer.
This is a new paint, too. Dale and I stopped at Time Machine because I wanted to get some Vallejo Model Air black. They didn't have any, but they had a new rack with Mission Models paints, which neither of us had tried. Since we were going back to work on the layout, and Dale was going to show me some airbrushing tips, it seemed like a good opportunity to try them.
Sunday, November 28, 2021
Rail Length
Getting ready to move a pile of rail from here to there at Depot St. I walked about 3 miles around the circumference of a 20’ radius circle in an afternoon.
What I also found interesting is the ratio we were moving. It was rolled in 1915 and 1922 for the NH, 107 lb rail taken out of the Canal Line near the Massachusetts border.
New Haven Rail
What’s the length of a piece of rail? The conventional knowledge is 39-feet, so it would fit in 40-foot gondolas. While that is true, 40-foot gondolas weren’t always the standard length pre-depression. In addition the surveying, real estate, and railroad industries use some standard systems of measurement.
These rails are two rods long, or 33-feet long, a rod being 16.5-feet. Of course, that worked well since it fit in 36-foot cars. The NH didn’t have 40’ gondolas (or flat cars) until the 58000-series of gondolas were built in 1929. (For more on those, including a diagram, see this post.) So they may have continued to receive 33-foot rail until those cars were built.
The 16.5-foot rod is related to other measurements - a chain is 4 rods (66-feet), a furlong is 10 chains (660 feet), and a statute mile is 80 chains. The surveyors’ chain is just that. A chain with 66 foot long links.
So for those modeling earlier eras (pre-depression to a large degree), it may be more appropriate to put those joint bars every 33 feet instead of 39 feet. This is appropriate on some lines even today, large portions of the CNZR is CNE/NH rail from pre-1926, the oldest I think from 1896-7. The Highland Line is still largely 107 lb NH rail, so I’ll have to go take a closer look at when it was produced. I suspect that I’ll need to go with that measurement on the layout.
Thursday, November 18, 2021
Weathering Experiments
Key Observations
- The cars in this era don't show a lot of heavy areas of rust like modern cars do.
- There is a fairly consistent coating of dirt/soot on the dirty cars.
- There is a range of "dirty." The density of the coating of soot likely has to do with how many months/years a car has gone without a repaint.
- The roofs tend to be darker.
- Some of the roofs show paint failure.
- Some of the wood roofs and running boards show repairs.
- A few cars (very few) show "chalking" or streaking of the lettering, like the X29 in the third photo.
- Reefers tend to be cleaner. I know that PFE washed their cars, presumably others did as well.
Base Weathering with Oil Paints
Tuesday, November 9, 2021
Just post something. Ha!
So here it is, a week, a week and a half, ummm, nearly two weeks since my last post. After being very consistent all year, my busy schedule has caught up with me. In this case it's been extra hours at all of my work/business endeavors, plus it was my birthday, etc.
That's not to say that I haven't been able to do anything.
After the last post, I was able to finish soldering all of the feeders to the rail at Whiting St. Yard that evening. I have also connected enough under the layout that it's even operating!
AML Modeling buddy Mark Stafford pointed me in the direction of Krone connectors. These are a type of punch block (well, several types) where you can terminate dozens of wires that are then connected to an output wire. In the US we have similar punchdown blocks for phone, and sometimes network systems. These look like a great idea, but getting it done now was more important, so I went ahead with my original plan of wire nuts and T-Tap Connectors.
As is typical, a few models have crossed the desk. I started working on a Wright Track (ex-Smoky Mountain Model Works, potentially available from Southbound Model Works & Decal Co). This has turned out to be quite a challenge, which I'll explain when I get to actually building it. I also cleaned up all the parts for a Resin Car Works DSS&A box car. This will be a fun (and quick) build, just not sure when.
Work at CNZR has been great, naturally. I take a lot of photos like these:



























