The changes are coming along and look like they will work well. I've been gluing down track in Stanley Works and the east side of town. The mockup for the west side looks good and should allow for 5 industries.
In addition it looks like I'll be able include at least 7 of the industries on the Berlin line not including the yard area. I was concerned I wouldn't have enough work for that crew.
The only challenge will be Whiting Street Yard. 8 feet really isn't enough for a double ended yard plus a yard lead. But I think can stretch it to about 10 feet with some creative construction. We'll see once I can get some lumber.