Wednesday, August 29, 2018

(Re) Designing Whiting Street Yard...Continued

Here's where we left off:

This is a more complete mock-up including the runaround, 4 yard tracks, a new (and more accurate) location for the scale track, and I've added a siding along the wall to include an industry that was missing, since it's supposed to be a crossover leading to that track (Track #5). 

So I have a good working mock-up, the space is in good shape, I'm good to go. Right?

Well, it would be nice if the loading docks for Landers, Frary and Clark were actual models. It would be even better if the factory itself was a flat model too. But the siding is 1 1/2" from the wall. No way I can fit that.

Problem #2 is that the hole for the mainline and yard lead are placed right between two studs. The studs are there because of how I had to build around the pipes in the ceiling. It's not a big deal to put in a couple of crosspieces and cut out part of one of the studs. It is, however, quite difficult to do when all the benchwork is in place on both sides, including the foam. I tried, but I decided to see if there was an alternative to moving the tracks.

So, mock-up #3ish...

Whiting Street Yard is actually on a curve. By angling the mainline across the length of the yard, I can create enough space for modeling the factory more appropriately. There will still be some compromises, but it will be much better. This actually works because the last loading dock is some distance from the end of the siding, which just runs next to the building at that point. So it can be close to the wall there.

In addition, to make this work, I have to move some of the turnouts onto the lift out. I'd already been playing around with this, because I can make  sure the clearance points are all on the lift-out, so the yard tracks are usable to the end of the fixed portion of the layout, which extends those tracks. The biggest change it forces, though, is that the freight house is now parallel with the edge of the layout. 

In response to a question from Dick about undulations in the ground, I sent him a couple of photos of the yard:
 J-1 pulling a train out of Whiting Street Yard taken from the Ellis Street bridge
T-2-b working Whiting Street Yard

These are both from the south end of the yard, presumably taken by Kent Cochrane pre-1946. There are a few things that stand out to me. First, the amount of weeds and grass I'll need to plant. Second, there's a fence between the Landers siding and the mainline, and I always seem to forget that the siding is on a small hill. Third, the space between Track #6 where the cut of cars is sitting, and the yard proper where there are rows of neatly stacked ties.

So several iterations of tweaks later...

The Landers portion of Track #5 is on a hill, with enough space between the that and the mainline for a chain-link fence. Most of the lift-out is a parking lot for Landers or the Freight House, with grass and bushes between Track 6 and the yard tracks, which isn't that far from accurate. Whiting Street is just off of the lift-out to the right in the photo now. I'm not sure I'll have room for the crossing gates, but I can squeeze in the crossing shanty I think. 

I had tried to arrange the turnouts at the south end of the yard in the same manner as the first photo with the J-1 and it worked until I moved the yard slightly to accommodate the piles of neatly stacked ties. It would take up too much space to try to match it more closely. But the bigger reason is that I moved the crossover between Track #6 and the mainline to this side of the Ellis Street.

On the prototype, the crossover is south of Ellis Street. But operationally, I was trying to keep a turnout off of the yard lead out of sight. Installing a crossover beyond Ellis Street also shortens staging. By putting the crossover between the turnout for the bulk tracks and the yard, it's still possible to pull trains directly out of the yard onto the mainline. So it's a workable compromise to make operation simpler and more reliable in the space I've got. Since the geography is so compressed here, the scale track sort of looks like the third house track anyway.

The runaround and scale track are placed appropriately, and the two track (instead of three for the freight house) looks good, including the bump out on the second track which matches the prototype. 

And the bulk tracks are...heading off the layout?!?

Yep. I could simply make it a dummy track, and dump the cars for the bulk track and Stanley Tools here. But if I put an 8" shelf across the aisle, I can add two bulk tracks, the Stanley Tools siding (a dummy track, but still operational) the concrete platform, and the pillar crane. I plan on building a hinged bridge that will swing like a door to connect the two, which will be opened as needed. By building the shelf as a shadowbox by cutting out the middle of a couple of studs, I gain another 3/5" so the aisle will be 30" instead of 37" wide.

But why? 

Well, for one, it puts the bulk tracks in a more prototypical location. I also plan on bumping out the main layout 6" so I can put trucks at the freight house. Oh, yes. The freight house. I can now build the entire freight house, compressed slightly. It will be about 85% to scale (about 615ish feet instead of 720 feet), but it should include all 17 truck doors, the office, and the covered platform. 

The yard tracks themselves are only compressed 25% or less, although I am eliminating 4 yard tracks and one house track. The industry siding now comes across Whiting Street itself to where the industry should be located, instead of the wall to the left. The Landers factory won't be that compressed, and will include the bridge over Ellis Street (although obviously none of the buildings beyond Ellis St.).

Operationally, the placement of the turnouts where they are keeps the working yard tracks as long as possible, and also shortens the effect of the curve itself. The yard lead on this end is Track #6 alongside Stanley Tools, and that remains the case on the model. 

I need a few more turnouts than I thought, but I can start building from the north end. As it turns out, I can fit a lot more than I thought I would, and the changes have made operations more prototypical too. 


Saturday, August 25, 2018

(Re) Designing Whiting Street Yard

So with the help of Dennis, Chris and Pete I've been getting the benchwork and room ready for Whiting Street Yard including staging in the utility room. What's next?

Track. Lots and lots of track.

Easy, right? I already know what I need/want and I started mocking things up when considering the freight house here and here. As a refresher, here's what I'm trying to squeeze into 11' x 30":




I know. Not gonna fit. At least not like that. And here's the first mockup:


It gives the appropriate feel, with the freight house next to the yard, and the bulk tracks coming around behind it. There are only two house tracks instead of three, and two bulk tracks, instead of six, and I probably won't be able to add the additional track that goes to Stanley Tools. There also isn't room for the concrete platform on the bulk tracks, although I can add the pillar crane. The truck side of the freight house is also very tight, and will be tough to put trucks there.

The stub-ended track is the scale house track. The freight house at this point is a total of 9 doors, plus the office and a short covered platform at the end, or about 4-feet long. That's roughly 50% to scale. It's a tight fit, but everything's there. The Ellis Street bridge will be the view block, and the yard lead extends past the bridge (as on the prototype) and alongside the staging in the utility room.

So, the one thing that's sort of odd on the prototype is the placement of the scale track.

I'm pretty sure that the primary cars that are weighed are the ones from the bulk tracks. L.C.L cars aren't weighed, since there are many loads in each car. Each shipment is weighed before loading. So most of the cars at the freight house won't be weighed. Most of the other cars that are loaded in town aren't bulk commodities. So they probably have arrangements for how much each crate of hammers weighs, etc. So those cars probably don't need to be weighed either. Coils of steel from Stanley Works, probably so. A box car of tools, probably not. Anyway, if the cars from the bulk tracks are the ones that need to be weighed, why is the scale track located where it is?

The answer lies in an earlier valuation map. The bulk tracks used to be accessed by a long switchback from the house tracks:


And when comparing the two maps, that's when I noticed it.

Based on the later map, they sold a big chunk of the land since it's now outside of railroad property. They added the long curving track to reach the bulk tracks. To do that, they had to eliminate the switchback and the long track in the middle. They took that track, and the track to the old engine house and turned it into a long runaround that is separate from the yard to connect the bulk tracks to the house tracks...and the scale track. 

Makes perfect sense. Pull the cars from the bulk tracks, shove them up one of the tracks, runaround the cars, and pull them down to shove them up the scale track.

Note that the scale track is stub-ended, so I don't need a gantlet track, the locomotive never goes past the scale. Conveniently, it's only a 42' (100-ton) scale. So it's short. I also have a Boulder Creek Engineering Weighstation to provide weights while operating.

So, that means I need two more tracks. So here's take #2:


Of course, in that amount of space, something had to give. And in this case it means the bulk tracks can't fit behind the freight house anymore. Operationally, though, it will work better, and more prototypically. So this looks like a good working mockup, time to finish prepping the space so I can start laying track. Right?

Wrong....

Friday, March 9, 2018

Is the three-foot-rule obsolete?

So in this month's Model Railroad Hobbyist, Joe Fugate has an editorial that spells out a number of different levels of detail in a "realism contiuum" that leans heavily on the three-foot-rule.

I suggest, however, that the old three-foot-rule may very well be outdated and obsolete. Why?

Because modeling audiences have changed.

Back in the day the three-foot-rule became a thing, most people had but a single audience for their model railroad. A relatively local group of people that could come see it in person. This grew a bit if you were near a convention and chose to open your layout to tours, but generally speaking, the majority of the audience for your modeling work were those that could visit your basement.

A secondary audience was to be found at meets (particularly in contests) where you could bring a diorama, display, or locomotives and rolling stock. The best of your work would be seen by a larger audience, although outside of the context of the layout. As such, the layout might be held to a lower standard than the contest models.

For a smaller group of modelers, the audience was expanded by being featured in the modeling press. A magazine article on a layout moved the basement into homes across the world. So at least portions of the layout would be made more "contest ready" for the carefully staged and photographed segments of the layout. The layout may not even be finished, but that didn't matter since you could frame the photos to feature the finished portions.

So what's changed?

The internet and digital photography.

Nowadays, the vast majority of the people likely to see your modeling efforts will likely never see it in person. And like the magazine photographs, everything in the pictures is "scale size." Things that looked OK at three-feet might look unfinished, dramatically oversized, or out of place. This is where the three-foot-rule begins to fall apart.

One reason I've already mentioned - everything is blown up to 1:1 scale in a photo. But the second reason might be the bigger factor. Folks looking at it can study it like they think Waldo is hiding somewhere in the layout. Each photo captures all of the details, and practically invites the viewer to look at the smallest ones.


This is, by far, the largest potential audience for your work. It doesn't mean that everything has to be super realistic, or perfectly accurate. But I do think that when building a model and a layout, it is worth considering what the rest of the world will see of your work, and how you want to present it.







Thursday, March 30, 2017

I-1 #1007 at New Britain Station

c1946. Kent Cochrane Photo

So here's another great shot of the passenger service at New Britain. This one is looking eastbound, showing a good portion of the Railroad Arcade. This was a building built by the railroad at the same time as the station. The building housed stores on the first level, and apartments on the second level. Originally, the station platform extended all the way to Main Street, which is behind where Kent is standing when he took this photo.

On the layout, the station and the arcade are just off the layout. I'll be making a model, or at least a facade, that will connect to the layout for the purpose of taking photos like this one.

The steel baggage car was formerly made as a resin kit by F&C, and rumors persist that Steve will eventually release a one-piece body of it. The second car is the ex-Besler train coach, imported in brass by Crown Custom. The heavyweight looks like one of the series with the taller windows that NKP Brass imported as an O&W coach.

I haven't identified a match for the truck, but it should be easily identified by somebody with more knowledge than me. I'm not sure what the truck is loading/unloading. They have a regular station cart with baggage or perhaps storage mail. Most of the passenger trains through New Britain carry REA traffic, it's just interesting that the truck is not labeled as such. Although it's possible that it is the shipper's truck, and they simply opted to load from their truck, rather than unloading it to the platform before loading it on the baggage car. I also find it interesting that so many of these trains carry REA traffic, since most of the passenger service through New Britain only goes as far as Waterbury (or Hartford eastbound). Train #472 comes from Waterbury to Hartford, and trains #131-136 are Boston to Waterbury and back (which also has an RPO).

In this case, I think it's #463, as the shadows indicate afternoon. During the summer this would be 4:46, (5:46 during daylight savings). This train handled REA traffic from Hartford to Waterbury (assigned 3'). Note that despite the full trees, #1007 still sports its pilot plow.

But one of the reasons I'm always hunting down additional photos of New Britain, despite the large number here at the station is that each different angle may provide a view of something in the background that I don't already have.

In this case a look at the coal and coke sheds for Union Manufacturing:


I find these quite interesting. The track is clearly labeled on some maps, and does not have an in-ground hopper for coal to be dumped. Looking at the height of the lower wall, it would appear that they most likely received gondolas of coal and coke that were unloaded by shoveling. At least that's my best guess. There's a gondola (probably coal for the T-2-b 0-6-0 switchers) and what looks like a New Haven double sheathed box car, both on the mechanical department track.

Fortunately, I don't have to worry about unloading the cars, just building the structure and spotting a few gondolas. The are visible in aerial photos, like this one:


But for the trackside view, that crop of that photo of #1007 is the best I have so far. In the aerial photo (from 1955) you can see a 44-tonner moving a New Haven box car on that track. Another box car is sitting on one of the mechanical department tracks (the same one as the gon and box car above), which used to be inside the engine house here. The workshop and one wall of the old engine house still stands. City Supply and Swift & Upton lumber are across the mainline. The stub track between the mainline and the billboard that now ends at Elm Street used to be to the two yard tracks (#15 and #17) that had, by this time, become a parking lot.

Despite the usefulness of such photos, it's amazing how much you can't see. I'll address something that's hiding in the shadows of that engine house wall in the next post, along with what used to be where those piles of lumber are.

Wednesday, March 22, 2017

Building a Roster: What is Rare?


K-1-d #404 with World of Mirth train in New Britain.
August 1940. Kent Cochrane 
A question was posted in response to a post by Marty McGuirk on the Modeling Steam Era Freight Cars blog some time ago. The post itself is regarding the percentage that each road comprises of a study of box cars through White River Junction, VT over several days in 1954.

The statistics are quite interesting, with 50% of the 3,605 box cars that were documented in those days. Marty included a pie chart along with a list of almost all of the reporting marks and their individual percentages.

Simon Dunkley questioned why the list showed that 50% of the cars were CN, but the pie chart shows at least 60% of the cars were CN.

The answer is simple - Marty only included the Top 10 roads in the pie chart. In which case the CN accounts for nearly 68% of the cars.

Ignoring the rest of the roads, no matter how small of a percentage of the total, skews the numbers. 

Individually, the roads represent what might be viewed as "statistically insignificant" in many cases. But collectively, they account for almost 27% of the cars during those days. I think it's important to remember that.

Freight Car Syndromes
I think it was John Nehrich that coined the "Pickle Car Syndrome." His point was that people like unusual cars (like pickle cars), and so they are overrepresented on our layouts. In general, I agree with this.

A related syndrome is "RTR Syndrome" in that we also overrepresent cars that are most easily acquired. I have far too many 1932 ARA Box Cars. Atlas made it simple by releasing the model with 10 different prototypical variations, covering nearly every one of the 26 roads that rostered the cars. So I have at least 10, probably more.

But for a prototype with around 15,000 total copies, I probably should only have 1 or 2 on the layout at any time. But because the current size of my roster is barely enough to cover a given operating session, almost all of them are on the layout during that session.

Many modelers combat this by determining how many cars they need of a given prototype (of the roster of box cars in 1950, for example, the 1932 ARA box car accounts for about 2% of the entire fleet of North American Box Cars. So out of 100 box cars on the layout, two of them should be 1932 ARA box cars. So they decide which two to purchase, and that's it.

This approach is often combined with a similar look at a given road's roster. For example, you might determine that you only need 1 box car owned by the New Haven railroad. They accounted for less than 2% of the national box car fleet. The obvious choice would be a 1937 AAR box car, since that was the most numerous box car owned by the New Haven Railroad in 1950. But they also owned PS-1 box cars, and more interestingly, 10' IH PS-1 box cars. What do you do?

This is where I think we fall victim to the "36-foot Double-Sheathed Box Car Syndrome."

In our quest to build a more "realistic" roster for our layouts, and ignoring budgetary concerns, we often restrict ourselves from purchasing rare cars, or too many cars of a given road, prototype, whatever. A number of studies have been done on 36-foot Double Sheathed box cars, which would seem to indicate that in 1950 your typical layout should have only one or two.

In 1950 only 8% of the national box car fleet were less than 40' in length, and of those, 71% were CN or CP Fowler single sheathed box cars. So in theory, out of 100 box cars, you need 8 cars less than 40-feet in length, and 5 or 6 of them should be Fowler cars, and 1 or 2 of them double-sheathed box cars.

The problem is, for many of us those specific 36-foot Double Sheathed box cars are always on the layout. Let's say it's an D&H car, F&C makes four variations of this car. There were about 1,000 still in service in 1950, or 0.1% of the national fleet. 

In our attempt to show that short double-sheathed cars are rare by only having one or two in our roster, we have instead given the impression that the D&H short double-sheathed car is relatively common in small numbers. Why? Because it's always on the layout.

This is a similar problem as reducing a list of approximately 60 road names with little representation, to a Top 10 list. We've skewed the numbers. In fact, by attaching hard numbers to several days' worth of data is undoubtedly skewing the numbers as well, almost certainly in favor of the CN and CV in that particular study.

A Cure?
So what do we do? Well, in terms of a study such as the one Marty references, that's among the best we have. So it's a great starting point. If we're modeling a specific prototype like New Britain, I can also look at the industries themselves to help determine appropriate roads based on prototypical offline industries. I can go further and look at the traffic on the through trains, and their origination and destination.

With the Waybill studies that have been done by others, plus other resources (such as American Commodity Flow published in the early '50s) I can see where the bulk of inbound cars are coming from with loads for CT. All of this helps.

But what do we do with this actual data? First, understand that nearly every box car that is owned in 1950 is fair game. This is part of your roster. If you want one 1932 ARA box car for each road that owned one, that's great. The more the better. 

Because what you roster doesn't have to be the same as what you run.

Sure, if you have different operators at every session, then you can run the same cars representing the same day every session. I would like more variety than that. I'm already accounting for changes over the years by building structures that can be swapped out as needed. Autos can be changed, and the era was a busy time for building new freight cars showing the evolution of freight cars in this period. And the New Haven not only retired steam in this era, but their diesel acquisitions were so rapid that the motive power changes on almost an annual basis during this time too.

The data from studies like the one Marty references is fantastic for populating your operating session from your larger roster of freight cars. I classify cars as common, uncommon, and rare.

Common cars are the ones that should not only appear in every session, but probably in quantities greater than one. In my case that includes PRR X29 box cars, NYC USRA-design steel box cars, and CN/CP Fowler box cars, among others. 1937 AAR box cars in general also fit this category. This also includes roads themselves, such as PRR, B&O, NH, CN, CP,  NYC, etc. in my case. For these handful of prototypes I need to figure out roughly how many (usually 2-3) would appear in any given operating session and make sure I have enough quantity to meet this demand. These cars account for about 50% of those in a session.

Uncommon cars are those that should appear in most sessions, but rarely in quantities of more than one or two. In Marty's post this comprises the roads that have a greater than 1% distribution. These cars account for about 25%. The quantity refers to the roads as a whole, individual cars may be different prototypes from the same road, or even the same prototype if there is a large amount of a single type of car on that road. Most of these cars will appear every few sessions.

Rare cars are those that shouldn't appear in every operating session. Or everything that is less than 1%. Of a given road or prototype, there probably shouldn't be more than 1 per session. This is about 25% of the mix based on Marty's post. These can be just about anything. While these make up a sizable portion of what's in the mix on the layout, a given car might appear very, very rarely.

DER-1 (DL-109) locomotives with Strates train at Whiting Street Yard.
June 1949. Kent Cochrane.
So the example of this post are some circus trains in New Britain. In various books are photos of the Ringling Brothers train in New Britain too. But there won't be a circus train every session. Maybe not more than once or twice a year. Most likely one will be used for my more seasoned operators, since they will tie up a lot of yard tracks making regular work more complicated. Otherwise they will be display and photograph models.

Another example is the PRR X30 box car. These were built specifically for servicing American La France in Elmira, NY to deliver fire engines. Sometime c1950 New Britain received new fire trucks, at least two, a pumper and an aerial from American LaFrance which were probably delivered in one of these box cars. The pumper is very similar to the Sylvan Scale Models 700-series open cab model. Corgi makes (made?) an American LaFrance aerial that could be a good starting point. The Jordan fire truck looks a lot like an earlier truck that was still in service as well. There is a fire station next to the police station on Commercial Street across from New Britain Station, so these are models that I'll be able to use. Of course, the station itself will be a flat, but the models being delivered in an X30 box car would make for an interesting photo too.

So buy or build whatever you want. Personally, as a freight car enthusiast, I want pretty much anything that is appropriate for my era that I can get. That's great. Because a larger roster allows you to more accurately populate your operating sessions.