Wednesday, March 17, 2021

Mysteries and Considered Research

It should be clear by now that I enjoy researching the railroad probably as much as I enjoy modeling it. For me it's not just about uncovering information, but also understanding it. Putting together the pieces to get a better picture of the whole. It's much like solving mysteries.

Since historical information is sometimes sparse, and I'm not modeling a road that I can just go down and watch or ask people who are currently on the job, I (we) often have to try to fill in the blanks with what I do have. There are people who do still remember the period I model, and their information is another piece of the puzzle, along with photos, paperwork, and other physical documentation. 

Sometimes, though, I have to make guesses, and later or other information may not support those. As more information is uncovered, I can see if that supports or refutes prior theories. My recent post on yard operations is a perfect example of that, where I interpreted the evidence one way, and have received some great insight from others, along with getting some more source material to work from.

So here's some thoughts on another subject, I welcome more input!

Freight House Traffic

I have ribbed Chris about how the Rocky Hill and Wethersfield freight houses don't receive cars by rail. We have evidence too, from first hand accounts (I'm pretty sure that John Wallace has commented on it), plus documentation in the form of the Freight Train and Package Car Schedules that not only don't list either freight house as originating or receiving traffic, but are identified as being served by truck.

As another example, Thompsonville is also not listed as originating/receiving freight at the freight house and being served by truck. a quick look at what I have right at hand and this is the case at least as far back as 1947.

So how to explain these photos I recently posted, courtesy of George Ford?





These, among others, clearly show cars freight cars at the Thompsonville freight house in the late '60s and early '70s. Did the NH or Penn Central re-establish service to the freight house? I don't think so, but I'd like to reconcile with the information I have available.

In most towns on the New Haven, there was a freight house and a bulk track (also known as a team track, although New Haven maps have them labeled as bulk tracks, where labeled at all). In Thompsonville, the bulk track is the same as the house track, and extends to an open platform beyond the freight house.

In addition, the Freight Train and Package Car Schedules are identifying the arranged package cars, that is, scheduled L.C.L cars to/from a given freight house. By the postwar era (and from what I can tell before), a lot of the L.C.L traffic was shifted to trucks because there wasn't enough regular L.C.L traffic at small town freight houses. Even earlier, peddler cars would be used, where the local freight (or in some cases a mixed train of passenger plus L.C.L) and the cars would be loaded/unloaded as the train waited.

So while it is true that Rocky Hill and Wethersfield freight houses weren't handling L.C.L in Chris' era, does that mean they didn't handle any traffic by rail? I think the answer is still no, they generally didn't handle any traffic by rail at the freight house. I think I have enough evidence to reasonably make that statement (while not excluding the possibility of an exception).

The freight service for customers that don't have a side track directly to their industry could be served one of at least two potential ways.

L.C.L at the Freight House

Whether the traffic came via rail or trucks, the less-than-carload traffic would be loaded/unloaded by railroad employees at the freight house. The customer facing side of the freight house typically had a platform and doors for trucks, depending on how the customer would deliver or pick up their goods. But to the best of my knowledge, customer would not be allowed on the platform to load/unload railroad cars.

Carloads at the Bulk Tracks (aka Team Tracks)

The bulk tracks often had a loading platform and a crane in addition to open tracks. Usually arranged with tracks in pairs, with a wider driveway to separate the pair of track. A truck could back right up to a box car or reefer and unload that way. The crane was generally used for transferring heavy goods from flat cars or gondolas to a truck, and the platform could be used for certain commodities like automobiles. 

Could L.C.L be unloaded at bulk tracks? In theory yes. And there are photos of cars like reefers being unloaded directly to trucks, and from what I've read there were often partial deliveries of produce.

Were any carloads unloaded at the freight house? Is that perhaps what we see in Thompsonville?

I think the answer to both questions is no.

Security

In terms of L.C.L traffic, the railroad is responsible for the goods from when they are dropped off to the freight house until delivered to the consignee. We have also seen shipments to multiple destinations could potentially be loaded by the industry on their own side track. But once the railroad has taken possession of the goods, they are responsible that it reaches its destination, and in good shape. The cars are locked and seals are applied. So if a car is to be partially unloaded, I think that a railroad employee must be present to ensure not only that the remaining load isn't stolen, but that it is properly secured and won't be damaged on the remainder of its trip.

Cost

As for carload traffic, the consignee can unload it themselves at the bulk track. If the railroad employees unloaded it, then there would be an additional cost to the industry. That's essentially the purpose of the bulk tracks - to allow an industry that isn't served directly by rail to receive carloads of freight.

To the best of my knowledge, we haven't seen any photos of freight cars at the Rocky Hill or Wethersfield freight houses postwar. But we have seen photos of cars at the bulk tracks, which is exactly what I would expect. In a town like Thompsonville, it's the same thing. It looks like the freight house is receiving goods by rail, but it's really the bulk track. In George's photos you'll note that the cars are spotted as far down the track as possible, instead of right in front of the freight house. The bulk track was the platform at the end of the freight house.


Monday, March 15, 2021

NH GA-4 60508 with Buoy Load

New Haven GA-4 class gondola 60508 with a buoy load.

I've seen another picture of this car load from another angle. Unfortunately, this one isn't in great shape, but it's an interesting load. The other photo that I've seen is much better quality, but from the other end and the placard to the left of the reporting marks is not legible in that photo. It says:

RETURN WHEN EMPTY
TO NEW HAVEN R.R.
BRIDGEPORT, CONN.

Note the tie-downs welded on the car sides. These aren't standard on New Haven gondolas and I am unaware how many received them. It would appear these cars were modified for special service, and thus the placard. There is a second gondola (60289) visible in this photo, and appears a third is to its left in the other photo I've seen. I cannot tell if they carry the same load, nor whether the tie downs are present on those cars as well.

Cars assigned to special service like this were noted in Transportation Department Forms and supplements. For example, here are a couple of pages from TD-12-G from December 15, 1956:


Unfortunately, I don't have one for this specific period around July '52 (when the car was reweighed) to see specifically what assignment it had. I believe that one or more of the gondolas had the tie-downs installed for servicing this particular load/company, which is why they were stenciled to be returned when empty.

New Haven Low Side Coal Cars (Gondolas)

In my era, the New Haven had three classes of gondolas designated in internal documents as Low Side Coal Cars (hoppers being High Side Coal Cars), L.S. Coal Cars, Coal Cars, Coal (Gondola), or simply gondolas. The primary designation appears to be Low Side Coal Car.


58000-58499 (Class GA-2)
41' 40-ton steel drop door gondolas built 1929 by New Haven.
Starting 1949-1953 the drop doors were welded shut/removed.
AB Brakes replaced KD brakes 1948.
Ajax power handbrakes installed 1948.
Most remaining sold/rebuilt/leased in 1955-56 and renumbered into the 59000-59249 series.


60000-60499 (Class GA-3)
43' 50-ton steel drop door gondolas built 1929-30 at New Haven.
1949(?)-1953 the drop doors were welded shut/removed.
AB Brakes replaced KD brakes 1947.
Ajax power handbrakes installed 1948.
Most remaining sold/rebuilt/leased in 1955 and renumbered to the 61000-61249 series.


60500-60649 (Class GA-4)
43' steel drop door gondolas built 1937-8 at Readville.
Built with AB Brakes and Ajax powered handbrakes
Drop doors were not removed until they were sold/rebuilt/leased back.

This group was almost identical to the GA-3 class (see the prior diagram), but when built had AB instead of KD brakes, and Ajax powered handbrakes, instead of Klasing, Miner, or Universal. The handbrake was 1-3/8" farther from the center line of the car. Unlike the other classes, the drop doors were not removed from these cars.

Drop Doors
All three of these classes were built with steel floors, four drop doors, and Standard Steel Car ratchet-type door mechanisms. They are clearly visible on the side of the builders' photo of 58000:


Starting c1947 (see the roster info below) the drop doors were removed. What is unclear to me is the process used. In photos it's obvious that the door locking mechanism is no longer present along the side sills. Someplace I recall it being reported that they welded the doors shut. I cannot find that reference at this time. If that's the case, then the doors would still be visible in the floor of the car.

When the cars were sold to International Railway Car Co in 1955, rebuilt at Readville, and then leased back to the New Haven, the floors appear to have been entirely replaced. So cars in the 59000- and 61000-series would have no evidence of the drop doors remaining.

Roster

The August, 1947 ORER lists all cars with drop doors. The diagram for the 60000-series indicates in a note dated 10-4-47 that the drop doors were removed from all of that 60000-604999 series cars.

I don't have any ORERs between the August, 1947 and May, 1950 issues, but through the March 1949 Summary of Equipment all of the gondolas are listed as having drop doors.

The June 1949 SoE shows 259 solid bottom and 236 with drop doors of 80,000 lb capacity (58000-series), and 264/379 solid/drop doors in the 50-ton 60000-series cars. Note that this does not separate the GA-4 class. However, the diagram indicates only the original 500 cars were modified, and the ORER/SoE data further verifies that the GA-4 class did not have their drop doors sealed/removed at this time.

That shows more than 50% of the cars having been modified in three months. So the timeliness of the changes may vary depending on the given report. What is clear is that by late '49, a substantial number of the cars had been modified. It would appear that the diagram was updated in 1947, but that either the sealing/removal of the doors didn't start until mid-1949, or that the modified cars weren't separated out in the roster until then. Some 1948 or 1949 ORERs would be helpful here (hint, hint...).

Other than working from photos, I don't have a list of when a specific road number had the drop doors sealed/removed.

Here are the quantities listed in the Summaries of Equipment and ORERs, with the 58000-series then the 60000-series listed separately, and each noting solid bottom/drop doors. The ORERs separate out the GA-4 class, the Summaries don't until the 11-51 issue.

09-49    272/223; 273/370 (1,138) - only missing five 58000-series and seven 60000-series 
12-49    291/204; 302/341 (1,138)
03-50    324/171; 376/267 (1,138)
05-50    361/134; 411/82; 150 (1,138) - ORER
06-50    409/86; 419/224 (1,138)
11-50    464/31; 459/34; 150 (1,138) - ORER
12-50    476/19; 481/162 (1,138)
03-51    479/16; 482/161 (1,138)
06-51    482/12; 488/155 (1,137)
11-51    489/5; 491/2; 150 (1,137) - GA-4 class listed separately now.
12-51    489/5; 491/2; 150  (1,137)
03-52    492/2; 490/1; 150 (1,135)
12-52    461/0; 397/0; 150 (1,008) - no drop door cars left except the GA-4 cars.
11-53    394; 286; 85 (765) - ORER
12-53    350; 258; 81 (689)
12-54    258; 184; 72 (514)
  • 58427 destroyed 5/3/51 Dunkirk, NY (NYC)
  • 60385 destroyed 1/15/52 Union City, PA (PRR)
  • 58063 destroyed 6/4/52 Pitcairn, PA (PRR)
  • 60277 and 60476 destroyed 10/28/53 in East Walden, NY (NYC)
From 1953-54, 82 cars pulled from all three classes were renumbered and reassigned to work service, replacing cars that had been converted to work service c1939 after these cars were built. All were condemned in 1961, and handful sold or condemned earlier. 

Starting in 1955, most cars would be sold to International Railway Car Co., who were required to rebuild the cars at their expense with railroad workers at Readville, and then leased them back to the NH.  The 58000- series cars were renumbered into the 59000-59249 series, and the 60000- series to the 61000-61249 series once rebuilt.

The SoE entries for the 58000/59000; 60000/610000; and 60500 series are:
12-55    204/54; 121/65; 70 (514)
12-56    24/217; 6/232; 4 (483)
12-57    25/217; 6/231; 4 (483)
12-58    25/217; 6/231; 4 (483)
12-59    11/217; 1/231; 1 (461)
12-60    11/217; 1/230; 1 (460)
12-61    11/216; 1/230; 1 (429)
12-62    11/216; 1/230; 1 (429)
12-63    11/216; 1/228; 1 (427)
12-64    11/216; 1/228 (426)
12-65    11/125; 1/129 (266)
12-66    11/26; 1/29 (67)
12/67    10/2; 0/3 (15)
12/68    61053 is the only remaining car. (1)

We can see the shift to the leased cars in 1955-6, although they maintained a very small roster of company owned cars. It's fairly steady through 1964, with only a small amount of attrition (slower than the roster as a whole), but then drops off quickly. The percent of gondolas to the entire NH roster:

New Haven Freight Cars (December)(% of gondolas to total)
1958    8,061 (5.9%)
1959    8,006 (5.7%)
1960    8.087 (5.6%)
1961    7,619 (5.6%)
1962    6,925 (6.2%)
1963    5,567 (7.7%)
1964    5,565 (7.7%)
1965    5,412 (4.9%)
1966    4,287 (1.5%)
1967    4000 (.38%)
1968    3,959 (.03%)

Modeling
The shorter 58000-series GA-2 class cars are easy to model since Funaro and Camerlengo produced a model, and I continue to bug Steve about completing the GA-3/4 classes. The models are excellent one-piece bodies and are available with and without drop doors.

As I noted above, though, when modeling the cars pre-1955, there's a question of whether the floor was replaced or the doors just welded shut. I think that initially they were welded shut, in which case the model with the drop doors is appropriate, minus the locking/operating mechanism, for any car except for those that were sold to International Railway Car Co, then rebuilt and leased back to the NH. In other words, for any cars numbered in the 58000-series.

Friday, March 12, 2021

Modifying the Tichy Flat Car, Part II

Part I here, and the photo that inspired it here.

With the basic car built, we need to look at the side sills. This is the most complicated part of the conversion, but it also gives me the opportunity to try some new skills.

Looking at the side sill casting itself, it's not a very complicated part. There are some rivets, and holes for the grab irons and stake pockets. The fact that the stake pockets are separate parts has a huge impact on being able to modify this model, as we'll see in a moment.

But the first thing we need to consider is how to make the longer side sills.

Option 1: Extend at either end.

This creates a much longer space between the first stake pocket and the end of the car. But the bigger issue is that the rivets for the bolster are out of line. We could consider moving these rivets, but the extended space between the end and the stake pockets will be noticeable.

Option 2: Extend from the middle.

Just like the deck, we could cut the side sills in the middle, and extend it that way. Since we didn't alter the relationship of the bolster from the end of the car, that takes care of that issue. But the relationship of the rivets for the crossbearers and crossties don't match, and it makes the spacing between the two center stake pockets noticeably too wide.

Option 3: Make multiple cuts.

This is a possibility I considered. But the stake pockets are almost evenly spaced (within 1/2" in most cases), so this requires a lot of little cuts.

Option 4: Scratchbuild the sides.

This is both easier, and perhaps a bit harder, than it seems. But it will also allow us to get the proper look. So that's what I've done.

I found that some .040" x .125" strip styrene was a good match for the basic dimensions of the model's side sill. It's just a matter of cutting it to size.

This is the larger of the new side sills compared to the original.

Then I needed to lay out the stake pockets. Starting with the CP car, I used the drawing for the CP car for guidance (since they are similar lengths. The center line for my car (yours might be slightly different due to cutting and sanding differences) was 2.8610 on my digital calipers. To the first stake pocket, 17" from the center line, is .1915".

Now the next several stake pockets aren't precisely even. To the next one over it's 3'-5", then 3'-4 1/2", then 3'-4 3/4". Because I knew there was going to be some variance simply due to my ability to precisely align everything, I stuck with one measurement of .4707" for all three. The next pocket is spaced closer 2-3/4" closer than the widest spacing. Since this was the shortest span, I opted to measure from the end to the first stake pocket, .2300", and used the wide spacing of .4707" between the first and second pockets from the end. That made the remaining spacing noticeably closer, as it should be.


You can see the center line of the new stake pocket locations compared to the original. The first pocket on both are very close to the same spacing.

Once I had them all marked, I carried those marks over to the second side sill. I then flipped that so I could carry the marks to the other half of both sills. Now I had the stake pocket center lines marked along both side sills.

I tacked the two pieces together back-to-back with CA. I carried the center line mark across the top edge. Using this as a guide, I used the model sill as a drilling template by lining up the center line to the center of the stake pocket location on the original piece. I then drilled all the way through the model sill and both side sills.


For the T&P car, which is only 1 board longer than the CP car, I had no drawing to identify the stake pocket placement. So I tacked the completed sill for the CP car flush to one end, and drilled out the stake pockets to the center line. I then tacked it to the other end, and drilled the other half.

This means that for the T&P car, I used the same spacing as the CP car, except a slightly wider spacing between the two center stake pockets, which happens to be a pretty close match to the center spacing of the NC&StL car.

In these pictures, the three pairs of side sills are aligned at the center line. 


Here they are aligned flush to the end.

You'll note that my hole drilling skills are inconsistent at best. That's OK, this will help align them, and if I find one is too far off, I'll just get rid of the locating pins. Since the stake pockets and side sills are styrene, the pins aren't really necessary.

Here's are the three length sides with stake pockets installed.

You can see how the stake pockets highlight the differences in the sides. As it turned out, for the pocket locations that were mis-drilled, it was easy enough to just squash down the mounting pins since they are very small. In fact, when gluing styrene pockets to a scratchbuilt styrene side in the future, I probably won't bother trying to drill the holes. It just didn't provide a significant benefit.

And here are the sides installed on the car bodies.




One thing I hadn't determined yet is whether I needed to worry about the gaps in the center sill. You can see here that the gap is noticeable above the trucks. 


On the car built as designed on the left, there is a single gap that will be filled by the installation of the coupler pocket. The car on the right has Kadee pockets, so I have a gap on either side of the bolster to fill. Also to come - rivets, end sills, brake appliances, and other finishing details.

Wednesday, March 10, 2021

Operations - More on Yards

Just as I posted on how yards operate, there was a discussion on the Proto Layout group about yard operations. Several of the posts were from real-life railroaders and how they didn't use the same track every day, how inbound trains would use whatever track was open, and they would shove cars where they could while working.

A few of the comments in the forum were about operating on a yard where the layout owner was rather rigid in their expectations as to how the crews would operate. In some cases the "offending" operator was a real railroader. They weren't offended by the owner questioning them, but they did know that they understood how to operate the yard/switching better than the owner.

Other comments indicate that railroads don't designate tracks that are used the same way daily, but adjust according to the day and traffic flow, and we should do the same.

I also received some very informative comments on the post itself. In addition, I have also acquired a book that I only recently learned about:

This is a book published in 1957 specifically about how railroads operate. The first half of the book is about Yard Operations. Admittedly, I've only gone through the book quickly, but will be studying it in detail. I really enjoy finding articles and books that were published during the period I model.

It appears I misinterpreted the evidence, and yards don't typically have dedicated tracks for building specific blocks/trains. It is certainly an approach that can make running an ops session easier, but since I'm trying to model prototypical operations, let's see if I can revise my approach, but still make it relatively easy for model railroad operators.

The book is quite amazing. I got a good deal on it, but I'm finding it tends to be priced fairly high. so good luck if you go hunting. I should also mention that John Droege's book and SC Ghose's book are also great too, but aren't as comprehensive about how a yard is operated. 

--

One of the things that was pointed out by Rob Simpson is that the Boston Car Checkers' Book is directing what yards to send cars, not specific tracks. The Yardmaster/crews will handle the cars once they are received at that yard. This will make some more sense once I outline the process a train goes through in a major yard.

I guess I'll just start by saying my last post was all wrong. :)

So I'll try again...

Large Classification Yards

This seems to be what most modelers are thinking of when the talk about a yard - a full classification yard with engine servicing. There will often be some extra servicing tracks (such as to receive coal and sand), and a bulk (team) track and freight house. Fewer models have cleanout tracks, or use their RIP tracks for short (same session) repairs. Icing tracks, stockyards, etc. are typically dependent upon the nature of the layout. While we won't get into all of the specialized tracks, other than I'll say that they are simply additional tracks that can be used to spot or pull cars.

Entering the Yard

Rob Simpson rightfully pointed out that the Yardmaster does control who enters the yard. The process, however, is different than is typical on many model railroads. What I was referring to was a practice on many model railroads of the train crew asking the Yardmaster if they can enter the yard. While we generally have to condense difference jobs, and the work they do, this is an approach I don't care for.

As Rob mentioned, the Dispatcher works with the Yardmaster to manage the traffic entering the yard. In my era there aren't any radios, so such control is primarily by signal. That is, if a Train Order indicates a train runs Berlin to North Haven, as we've seen in some of the orders I have, the Agent at North Haven would have orders for their next movement, presumably into Cedar Hill Yard. Such a movement would also be controlled by signals entering the yard.

The inbound track will be lined ahead of time for the train by the yard crews.

Once the train enters the yard, the road crew has completed their run and, due to union rules, cannot move their train within the yard proper (I'm referring to a terminal/classification yard with engine servicing, etc.).

Checking the Train

At this point, there is a lot that goes on before the train is actually broken down and classified. As we saw in the article, the caboose may already have been dropped, otherwise it is moved off of the train.

Inbound clerks record each car by road and number, and also verifies the seals on house cars and must replace any that are broken, damaged, or applied improperly. At the same time, the Car Department is checking the cars for defects, and may also check to see what empties need cleaning out, and the class of empties (that is, what load they are suitable for).

In the meantime, the Conductor will have taken the waybills to the Yardmaster or clerks, and they will be verifying those against the Inbound Clerk's report. Depending on the road and era, they may have had a report ahead of the train's arrival to verify against. At this point they can start the work of classifying the train.

In other words, it can take 30 minutes or more to process the inbound train before cars are switched out at all. If it's a hump yard, the entire train (or in cuts if too long) can be shoved up the hump to be classified on the move. Otherwise, the Yardmaster and his clerks will be writing up switch lists for the switching crews which tell them which cars go to which tracks.

Designated Tracks?

Like a local freight, the crews just move the cars where they are told. They aren't really concerned with what's in the car, or its final destination. That's not to say they don't know at all, but it's not necessary for the work. And this ties into the idea that there are designated tracks. 

At the end of the shift, the Yardmaster fills out a log that tells the incoming Yardmaster the state of the yard. What blocks are on what tracks, etc. Apparently the Yardmaster shift typically ends a half hour before the clerks', so the new Yardmaster can consult with any of them for additional information if they have questions.

So the answer is no, there probably aren't dedicated tracks. Although if capacity and traffic flow allows it, there's no reason why there can't be. But I think it highlights a different aspect of how a yard operates that is usually missing from model yard operations - the Yardmaster writes out switch lists.

Many model yards operate by the Yardmaster telling the crew to break down a train, and build a specific train, but leaves the process up to the crew. That is, the crew starts looking through car cards/waybills to find the cars they need for the next train, and then start to dig them out and figure out what tracks to use while doing so.

Having designated tracks can substitute for a Yardmaster writing out switch lists. Why? To provide the crews another level of information to help manage the flow in the yard. Especially if there is more than one crew working. This can be important, because the switching crews may not have all of the information that the Yardmaster (presumably) does in terms of future work and movements.

Classification

We generally have to condense our yards considerably. For a large yard on the prototype, with engine servicing, etc., there is often an eastbound and westbound yard at the very least. Very large facilities, like Cedar Hill, have multiple arrival yards, classification yards, and departure yards. Not just arrival/departure tracks and a classification yard.

Since we typically don't have that luxury, we need to be well organized to keep things flowing. Part of that is that we condense the time it takes. For example, we don't take the 30-minutes plus to process an inbound train. As soon as it arrives we tend to start breaking it down immediately. I would recommend trying to schedule things in a manner that when a train arrives your Yardmaster at least has some time to write out a switch list for the crews, rather than leaving it to them. Barring that, you can have them prepared ahead of the session, but that would also require that every car for inbound trains is in the same order as the prepared switch list.

The process of classification is to break down the inbound train into blocks that will then be assembled into new trains. That is, it's not about building trains, but building blocks. For a model yard, the best approach for this is to have one switching crew working one end of the yard breaking down and classifying trains. The road crew/hostler will move the engines to servicing, and the first job of the switching crew (since we usually can't kick cars) is move the caboose. Once the Yardmaster has prepared a switch list, it's just a matter of pulling the train (probably in chunks) and shifting cars to the appropriate tracks.

The Yard Foreman (aka conductor) will still determine the best way to work the switch list. But it provides a lot more guidance than I see from many model Yardmasters.

Building Trains

The Yardmaster also needs to prepare switch lists to build the outbound trains. If you have a second switching crew, they can work the opposite end of the yard and it's a matter of pulling blocks and assembling them in the correct order for the outbound train. Ideally each track holds individual blocks, but that may not be possible in a model yard, so the crew may have to do some switching to dig out the cars they need.

After the train is built the Clerks record the train as it stands, Car Checkers verify that the journals are oiled and packed (unless a later era), the brake line is pumped up with air, and the brakes tested, the Conductor has to record their train and verify it against their waybills, etc. Like the inbound train, once the train is built it can take 30-minutes or longer to go through all of the processing to verify that it's ready to go.

Other Yard Jobs

There are still more jobs that happen on the prototype during these processes. Empties may be pulled to a cleanout track, light repairs to a RIP track, and when completed these cars are moved back to the classification yard to be added to trains. The air is bled from all of the cars to prevent issues with switching, but they also have to set and release multiple handbrakes on the cuts while they sit in the yard. We are used to trying to move cars through the yard pretty quickly, but the reality is that it's a time consuming process. 

Small Yards

A small yard, on the other hand, can be very different. For example, Whiting St Yard had a capacity had 8 tracks, ranging from about 650 feet to a little over 1,300 feet. The New Haven measured sidings in 48-foot long cars, so using that measure the roughly 8.700 feet of yard tracks is about 180 cars.

These figures don't include the long runaround track, bulk or house tracks, nor anything designated as an arrival or departure track. Way back there was a small turntable, but no engine servicing, and it's long gone by my era. Water plugs were found at Berlin and New Britain stations. New Britain did have a small engine house with a crane to coal up the locally assigned switchers, but it wasn't connected to Whiting St Yard, and wouldn't have serviced other trains.

Two daily freights would drop off cars overnight and in the morning, and then two more picked up later in the day. The "yard crew" consists of the two switchers assigned to New Britain as a whole.

From talking with former New Haven crews, I know that the cars were dropped on the long sidings (Track #5 in New Britain on the Highland, Track #6 on the Berlin Line for Whiting St.).

I don't think there was a Yardmaster, or Foreman in New Britain. I believe the Agent would have managed the work flow based on the needs of the local industries, almost all of which were within Yard Limits. I lack any concrete evidence one way or the other.

The crews would know which cars needed to go where, and often when, and they would have instructions for the outbound cars. But how they choose to work that is entirely up to them. With maybe 30 cars left overnight, and another 10-30 car inbound cut in the early morning, and with 8 tracks to classify them, plus an additional seven yard tracks in New Britain Yard, the crew could utilize the tracks however it worked best for them.

There were no radios on the New Haven, so the two switching crews needed to coordinate in person, or via the Agent, and road crews would take their paperwork to the Agent as well. Since New Britain had an active freight house, there would be a Freight Agent there, and I'm assuming the Station Agent would be in communication with them regarding cars in New Britain Yard. I, of course, will only have a single Agent to perform all of those duties. Road Crews dropping off or picking up work at Whiting St will use the phone to speak to the Agent at New Britain Station.

It's (Still) All About the Workflow

Since the inbound cars would have been in a New Britain block, the order of the cars could be anything. The yard would rarely be anything above maybe 20% of capacity, but you could sort the cars into many different blocks, depending on how you intended to work the industries and the particular mix of cars that day. 

Once again, the flow of traffic has an impact here. For example, in the morning, the traffic is all inbound. So any of the yard tracks can be used to sort cars to be spotted.

In late morning, there will need to be a place to shove cars pulled from industries while spotting the inbound cars. 

By the afternoon, the majority (if not all) of the inbound cars have been spotted, and the yard can be used to assemble the outbound blocks.

On the CNZR

Having gone along for a few days, I can say that the actual work is performed differently almost every day. This has a lot to do with the capacity of the railroad. If it's possible to make a single trip, then they will almost always pull everything first, then go to Hartford. But sometimes that's a problem due to the number of cars waiting for them in Hartford. So they may pull the cars after returning from Hartford, and take down any empties left from the day before in the first trip. 

The Best Way?

I'm always trying to uncover how things worked in my little portion of the prototype world so I can try to replicate (model) the operations as they actually occurred in New Britain. But I'm also interested in how the railroad operated on a bigger level. While it seems complex (and it was), it was about as simple a process as could be designed considering the limitations. The trick for model operations is to condense and/or eliminate what was done by a small army of clerks and crew, while still simulating what the railroad actually did.

Obviously the best way is whatever works for you. But I think the key here is good design, keeping in mind that our operators aren't doing this every day like the prototype crew does.

So an updated list:

1. Arrival Tracks are the most important tracks. I still thinks this holds true, because without an open Arrival Track, the rest of the layout gets backed up.

2. Provide clear instructions to the switching crews that have to break down the trains. Classifying trains is the most complex part of the job, and even when a crew knows exactly which cars need to go where it can still be the most time consuming. Designated Tracks is one option, although I think a Yardmaster that can write up switch lists to account for the flow is better, and more prototypical.

3. Simplify. We often run using fast clocks, and while we could build in the standing time of a recently arrived or newly built train, this will probably happen automatically. Especially if the Yardmaster is writing out switch lists. In the late '40s the New Haven started using an IBM computer system and teletype to send the information for inbound trains to the next yard (Maybrook, Cedar Hill, and Hartford). Providing the inbound info early where possible will let your Yardmaster prepare switch lists more quickly.

4. Block your trains. While there will still be classification to do within blocks, I still think having inbound trains blocked will help the Yardmaster prepare work faster, and will help the crews switch the trains faster. 

I think more than anything else, this book really clarifies the job of the Yardmaster. They coordinate all of the work, but like all of the work on the railroad, it's done with paper (usually multiple copies). The most important process oriented paperwork would be switch lists.

Now I really wish I could go run one of the yards at RPI again. Lots of new things to try...

Monday, March 8, 2021

Flat Cars with Girder Loads

 

I can't see a reporting mark on any of these flat cars, so I don't have much to say.

But here's a picture from the February, 1942 Along the Line that looks with similar blocking:


These are for the new Hartford bridge, although I don't know specifically which one.

From the June, 1941 Along the Line is another large girder load:


This one indicates it's three girders on 16(!) flat cars for the Hutchinson River Parkway bridge that will span the 6-track Hell Gate Bridge route.

Of these, the only flat cars I can identify are what look to me like the Pennsy F-30/F30-A class in the second photo. While there is the Bowser model (which I carved out the holes in the underframe) and Sunshine models, the forthcoming Rapido car is the one to get at this point.

Obviously, these very large girder loads will be seen during this era as large highway bridges are being built. The required blocking appears minimal, but substantial.

Here's some blocking information for these types of loads from the Loading on Open Top Cars. As you can see from the first page of my copy, this is from the PRR printing of the book. Because it's bound so tightly, I can't get a decent scan, so you'll have to excuse the quality of the photos.