Saturday, January 9, 2021

What else am I working on? Lots of small projects

Most of my recent modeling hasn't been that post-worthy. Gluing down track, etc., and I've had a lot more research/computer time recently (thus all the posts on commodities), but I wanted to keep up with the modeling posts too. 

I did spend a couple of evenings de-flashing 7 resin hopper kits worth of parts. The top box is 3 kits, and each of the other boxes two additional kits, each box being a different prototype.

I have 6 more to go. I'm kind of making a habit of this when I have some spare time that's not long enough for another project. I have already cleaned the flash off of the hopper bodies, and also drilled holes. So I'll be ready to do a push to finish assembling them once I've gathered the prototype material and made sure I have trucks for them. 

I also added a couple more short staging tracks behind the Agent's desk where I realized I had some space (and a couple of spare turnouts):

These will be used for parking locomotives not used in a given session. I'd like to have enough tracks to store all of the locomotives on the layout to minimize handling. I will probably install switches to cut power to the tracks when not used.

I also noticed that the couplers sat a little high on the RS-2s. So I used a red Kadee washer to lower them.


This required filing down a small amount of the pointed portion of the steam line doors.


I completed relaying the mainline and Track No. 5 around the back corner where I had taken them up for some work. I wanted the tracks closer together along the straight section to provide more room for the eventual Union Manufacturing building.


The front track (eastbound main) proved a bit more problematic to get right, and once I did I decided not to try to adjust the curvature of the other tracks to be closer here. It will be pretty well hidden by buildings anyway and I can work with it scenically. The key is that it must operate properly.

I had considered installing a track for Skinner Chuck Co. on the inside of this curve (the only major industry missing), but it really just won't fit. This entire section should be on a broad curve going the other direction, but the basement wall got in the way...

The light blue masonite has two new industries, North & Judd storage, and P&F Corbin coal track, so I'm glad I was able to add those. The rest of the work on Track No. 5 will wait, because I want to use the forthcoming Fast Tracks Diamond Line crossing once they are available. They look amazing. I'm also considering hand laying the turnout at the end of Track No. 5, which is currently a curved Walthers turnout. 

The rest of the work has been continuing to rearrange the basement and find homes for everything, final tweaks on trackwork and dropping feeders. I'll spend a day (hopefully with Chris' help) soldering them all to the rail, since that's easier with two people for a lot of these locations. I'm really not that far from having a fully operational layout again, and that's a priority.

Thursday, January 7, 2021

Commodities and Routing - ERIE, B&M, BAR. MEC. PM

Commodities are interesting, but don't necessarily have a direct impact on the operation of the railroad. Indeed, in real railroading, unless a specific car is requested by a customer, or special handling is required, the crews probably don't care what's in them. 

Routing, on the other hand, can have an impact on operations. Particularly when considering the mix of cars for a train.

For example, Erie has a direct interchange to the New Haven in Maybrook NY.  So one would expect that cars loaded on the Erie would come via Maybrook. Would they come via other interchange points too?

Routing wasn't as complex a process as it might seem, but it did involve more work pre-computer era. While shippers could specify the route they wanted, I think that most of the time the Agent selected the route. To do that, they used Routing Guides. I have several of these guides, but far from a complete collection. Of course, an Agent only needed the guide that applied to shipments from their station. I want them to determine routes for inbound and outbound cars, so I've been trying to dig them up for as many roads as I can.

The basic process for the Agent is to look up the destination in the Routing Guide, and it would list one or more routes to that destination. The Agent would select one, and notate the entire route on the waybill. This would serve as the routing instructions for conductors and yardmasters along the way.

This was sparked in part to some recent questions in multiple forums online asking about smaller interchanges on the New Haven. The routing of cars was very well considered when developing these routes, and for this example I'll look at shipments from the Erie to four locations on the NH::

  • Holyoke 960
  • New Britain 3910
  • Plainville 860
  • Simsbury 920

Each station is assigned a number. Various publications by each railroad, along with national publications, use these numbers. 

For example, the New Haven Official List of Stations:


A national periodical, published annually with periodic supplements, is the Official Open and Prepay Station List, which covers all of North America:


The same station numbers are used in the Routing Guides, like the Erie, C&O (PM) and B&M ones I'm referencing today. Here's the Erie one:

--

I've chosen the stations above because there are several interchange points north of Plainville on the Canal Line, and I also want to narrow down what won't come through New Britain to those destinations.

  • B&M at Northampton, Easthampton and Holyoke
  • B&A at Westfield

According to a NH Freight Interchange Map from 1929, the annual volume at these points in 1928 were:

  • Easthampton: 750
  • Holyoke: 6,078
  • Northampton: 3,651
  • Westfield: 11,536

For comparison, in 1928 Maybrook handled 553,029 cars.

It appears that in 1925 and 1926 a significant amount of the traffic was shifted from Northampton to Springfield.

  • In 1924 Northampton handled 65,999 cars and Springfield 99,569.
  • In 1925 Northampton handled 36,079 cars, and Springfield 119,421.
  • In 1926, Northampton handled 3,065 and Springfield 132,911.

This corresponds to changes in the freight schedules as well. In 1925 NS-4/SN-1 was a through freight that connected at Northampton and Springfield. What's not clear is how it worked both, but here's a note from SN-1:

"...Fills out at Springfield with freight for New Haven and beyond..."

By 1927 this is no longer the case, with those trains only running to/from Springfield. It would have to go down the Canal Line, over the Highland from Plainville to Newington, then take the Springfield Line through Hartford north to Springfield, unless they had trackage rights over the B&M from Northampton to Springfield. Neither as simple or efficient as moving the bulk of the interchange traffic to Springfield.

--

I'll start with the Erie. This is about an 800-page book from 1944 with routes from Lines West (Illinois, Indiana, New York, Ohio and Pennsylvania). It also covers some originating points on the Indiana Harbor Belt, Pennsy, and Winona Railroads. Lots of destinations are included, I just make sure Connecticut is included before I buy one of these Routing Guides.

Because we know the four station numbers, we can just go to the pages that specify destinations on the New Haven. 

Let's look at the ones they all have in common first:

1. Erie, Maybrook, NY, NH

Simple, and expected. Anything loaded on the Erie can be routed over the Erie to Maybrook, NY to be interchanged with the NH.

8. Erie, Carbondale, PA, D&H, Scranton, PA, Erie, Maybrook, NY, NH.

From certain originating points, the Erie interchanges with the D&H at Carbondale, PA, and then the car will come back to the Erie in Scranton, PA before reaching the New Haven at Maybrook.

So where do they differ? These are routes that go to Plainville or New Britain, but not Simsbury or Holyoke.

3. Erie, Binghamton, NY, D&H, Mechanicsville, NY, B&M, Springfield, MA, NY.

14. Erie, West Middlesex, PA, NYC (W), Gardenville, NY, NYC (E), Selkirk Junction, NY or Rensselaer, NY, NYC (B), Springfield MA, NH.

This is interesting because it notes the different districts or divisions it will run on the NYC, the Eastern, Western, and then NYC (B), which is the B&A District. 

18. Erie, Marion, OH, NYC (C), Cleveland OH, NYC (W), Gargenville, NY, NYC (E), Selkirk Junction, NY or Rensselaer, NY, NYC (B), Springfield MA, NH.

All of these go through Springfield, MA on either the B&A or B&M. Why wouldn't these be used for cars to Holyoke?

Because both the B&A and B&M have interchanges with the NH that are closer to Holyoke. These are their alternate routes:

2. Erie, Binghamton, NY, D&H, Mechanicsville, NY, B&M, Northampton, MA, NY.

19. Erie, Marion OH, NYC (C), Cleveland OH, NYC (W), Gardenville, NY, NYC (E), Selkirk Junction, NY or Rensselaer, NY, NYC (B), Westfield MA, NH.

Route number 2 is interesting because it goes to Northampton instead of directly to Holyoke. We'll see this is consistent with a B&M Routing Guide in a moment. This would lead one to believe that at least by 1944, interchange with the NH in Holyoke had been reduced to nearly nothing.

So routes to Holyoke and any of the towns on the Canal Line north of Plainville could come via Maybrook via the Erie, Northampton via B&M, or Westfield via B&A.

There are also some interesting routes possible:

7. Erie, Binghamton, NY, D&H, Sidney, NY, O&W, Campbell Hall, NY, NH (applicable only to shipments of Grain and Grain Products).

As you can see, this specifies that the route is used only for specific commodities.

9. Erie, New Castle, PA, B&O, Locust Point (Baltimore), MD, M&M T Co., Providence RI, and NH (Carloads only).

10. Erie, New Castle, PA, B&O, Locust Point (Baltimore), MD, M&M T Co., Providence RI, and NH (Carloads only)

11. Erie, Youngstown, OH, P&LE, Connellsville, PA, WM, Baltimore MD, M&M T Co., Providence RI, NH 

These three route are quite interesting indeed. It appears that this is routing cars to Baltimore where they will be transloaded into M&M Trucking Company trailers, and then routed on flat cars from the B&O to Providence on the NH. 

Update: I was incorrect in this theory, see Jeff Ward's comment below.

Mike Clements had sent me the following info as well and I hadn't updated the page yet:

... a couple of points about your post:

    1. MM&T was a steamship company – Merchants & Miners Transportation Co. – not M&M Trucking. They participated in joint rail-water through tariffs via breakbulk. Their hub was at Baltimore and they served the Northeast. These routings got suspended during or before WWII and were never resumed. Same thing with the RUT routes with the Great Lakes steamers via Ogdensburg.
    2. I think the routes correspond to published through tariffs. Shippers could pick another route, but I think that opened them up to being billed rule 11 (each carrier issues a separate bill) at local and proportional rates.
    3. The first route on the list appears to be the preferred route of the carrier publishing the guide – makes it easy for agents to advise the line that is going to make the company the most money.

This is all great stuff guys, keep it coming!

But for my purposes, routing via the Erie consists of:

  • Erie > Maybrook > NH > NY/YN or OA/AO
  • Erie > D&H > Erie > Maybrook > NH > NY/YN or OA/AO
  • Erie > D&H > B&M> Springfield > NH > HDX-5
  • Erie > NYC > B&A > Springfield > NH > HDX-5

The Northampton and Westfield routes are interesting, but not terribly useful for my layout. 

So the answer is that yes, most Erie cars will probably come through Maybrook as expected.

But cars loaded on the Erie and bound for New Britain, Plainville, or the New Hartford Line can also come via Springfield. But we probably wouldn't see Erie loaded cars for points north of Plainville coming on HDX-5 to be dropped in Plainville for the NY/YN freights.

The different routes apply depending on the location loaded. So as I identify off-line industries, 

If we know the originating station, then we can go a step further which may narrow down the route even more. For now, though, we'll just stick with all possible routes.

--

Boston & Maine

The B&M book is from 1955, and includes loads originating on quite a few lines besides the B&M, including BAR, Bar&C, B&ML, MEC, PF&N, and StJ&LC. 

The B&M routings are much simpler:

  • For Simsbury/Holyoke: Via Northampton
  • For New Britain/Plainville: Via Springfield

Bangor and Aroostook

The B&M book also includes traffic from BAR, and it's different:

  • Simsbury/Holyoke: Via Northampton
  • Plainville: Via Springfield
  • New Britain: Via Worcester

Loads to New Britain are routed via Worcester, indicating that they would take a route from Worcester > Providence > Cedar Hill to NY freights to New Britain. 

Maine Central

The B&M book also includes traffic from MEC, and it's different again:

  • Simsbury/Holyoke: Via Northampton
  • Plainville: Via Springfield
  • New Britain: Via Springfield or Worcester, depending on originating point.

Again, interesting information. Loads from BAR and some of the MEC loads will be coming up the NY freights instead of via Hartford. I believe the differences in these routes were (at least in part) for balancing traffic. 

St. Johnsbury & Lamoille County

A Vermont shortline that highlights some of the other connections the B&M has:

For all four destinations:

13. StJ&LC, Sheldon Jct, VT, CVt,, New London, CT, NH

For New Britain/Plainville

1. StJ&LC, St. Johnsbury, VT, CP-E, Welles River VT, B&M, Springfield, MA, NH

9. StJ&LC, Sheldon Jct, VT, CVt, Windsor, VT, B&M, Springfield, MA, NH

For Simsbury/Holyoke:

3. StJ&LC, St Johnsbury, VT, CP-E, Welles River VT, B&M, Northampton, MA, NH

11. StJ&LC, Sheldon Jct, VT, CVt, Windsor, VT, B&M, Northampton, MA, NH

Barre & Chelsea

This is another shortline in Vermont. All routes go through Wells River, VT (spelled differently than the SJ&LC page...) to the B&M and then either Northampton or Springfield as expected.

Other Short Lines

The Belfast & Moosehead Lake, Passamaquoddy Ferry and Navigation, and Seaport Navigation are listed as notes that all route through the MEC at:

  • B&ML - Burnham Jct, ME
  • PF&N and SNCo - Eastport, ME

--

Pere Marquette

What about roads without direct connections? As the B&M book shows, distant roads will have routings to indirect connections as well.

I have a 1944 Routing Guide from the Pere Marquette as an example. As one might expect, there are more potential routes to get to the New Haven.

1. PM, East Buffalo or Black Rock, NY, DL&W, Port Morris, NJ, L&HR, Maybrook, NY, NH

2. PM, East Buffalo or Black Rock, NY, DL&W, Norwich, NY, or Scranton, PA, O&W, Campbell Hall, NY, NH

3. PM, Suspension Bridge or East Buffalo, NY, Erie, Maybrook, NY, NH

4. PM, Suspension Bridge or East Buffalo, NY, Erie, Binghamton, NY, D&H, Mechanicsville, NY, B&M (See Note 1), NH

5. PM, Suspension Bridge or East Buffalo, NY, LV, Easton, PA, L&HR, Maybrook NY, NH

6. PM, Suspension Bridge or East Buffalo, NY, LV, Jersey City Term, NJ, Harlem River, NY, NH

7. PM, Suspension Bridge or East Buffalo, NY, LV, Sibley Jct, PA, O&W, Campbell Hall, NY, NH

9. PM, Suspension Bridge or East Buffalo, NY, NYC (E), Rensselaer or Selkirk Jct, NY, NYC (B), (Note 2), and NH

10. PM, Suspension Bridge or East Buffalo, NY, LV, NYC (E), Rotterdam Jct, NY, B&M (Note 1), NH

11. PM, Toledo, OH, PRR, Greenville Piers or Jersey City, NJ, Float, and NH (Note 4)

12. PM, Detroit, MI, CP-E, Wells River, VT, B&M (Note 3), NH

13. PM, Chatham, ONT, CP-E, Wells River, VT, B&M (Note 3), NH

14. PM, Toledo, OH, W&LE, Bellevue, OH, NYC&StL, Buffalo Jct, NY, DL&W, Port Morris, NJ, L&HR, Maybrook, NY, NH

15. PM, Toledo, OH, W&LE, Bellevue, OH, NYC&StL, Buffalo Jct, NY, LV, Jersey City Term, NJ, Harlem River NY, NH

These routes are valid for all four destinations, except #13 which is not listed for any location except New Britain. There are also several notations for clarification:

1. Route 11 does not apply from Chicago (PM No. 5)

2. Routes 14 and 15 applies only from Manitowac, Milwaukee and Kewaunee, WI (PM Nos 3190, 3195, and 3200)

12. Route 12 is not applicable from Detroit, MI (PM No 1475)

14. Route 13 is not applicable from Chatham, ONT (PM No 3605)

16. Route 11 is not applicable from Kulmbach (PM No 2825) or Port Austin, MI (PM No 3160), nor from Aurthur (PM N 3240) to Grassmere, MI (PM No 3315) 

There are also 4 Notes:

Note 1 - Via Rotterdam Jct, or Mechanicville, NY, B&M and Northampton (north of Plainville) or Springfield (New Britain/Plainville)

Note 2 - Via NYC (B) and Springfield (New Britain) or Westfield (Plainville and north)

Note 3 - Via Wells River, VT, B&M and Northampton (north of Plainville) or Springfield (New Britain/Plainville)

Note 4 - When on account of clearances, shipments cannot be handled via Greenville Piers or Jersey City, NJ routes, such shipments may be routed via PRR, Belvidiere, NJ, L&H, Maybrook NY, NH.

--

Do you need the Routing Guides? Not necessarily. With the freight schedules, we know that traffic to New Britain comes from certain trains, from Maybrook, Cedar Hill, or Hartford.

We know that traffic via Hartford will come via Springfield or Maybrook (for the New Hartford local, but not New Britain). We know which roads interchange at Maybrook, and Cedar Hill rounds up the traffic from Greenville, Fresh Pond, Harlem River, and New London (and Maybrook when the OA/AO trains aren't running).

But the routes clarify that traffic to the Springfield Line west is unlikely to come via a Boston>Cedar Hill train. We can also see that traffic to the Canal Line north of Plainville will receive cars from NYC (B&A) and B&M via Northampton and won't be part of the NY/YN traffic.

Some routes seem obvious - traffic from the northeast is coming through Springfield or Northampton, and occasionally via New London. But I didn't expect the routing via Worcester, for example. It makes sense, though, because it reduces the volume of traffic through Boston.

Coming from the West it's little surprise that a road with a direct connection like the Erie will handle most of the traffic to that interchange. But traffic from farther north can flow via other roads to Springfield and Northampton.

It's also not surprising that once you get to an indirect connection that there are more potential routes via a carrier that interchanges with the NH. Remember that a few routes will go via Canada. One example, loads of automobiles may be coming through Springfield on the B&M instead of via Maybrook carriers. It's easy to think that Maybrook or the Greenville/Jersey City floats are only routes from out west, and that's not the case.

I find the routings interesting by themselves. But they are also useful in building train consists, leading to a visible difference in the mix of freight cars on the different trains. This will be particularly evident in the through cars to the Canal Line north of Plainville on the NY/YN trains, since they will contain fewer cars from New England roads.

Tuesday, January 5, 2021

Plans for the Year

I don't really need to comment on what a year 2020 has been, but I will say that I've gotten more modeling and work on the layout done than in quite a while. Even better, I posted more posts to the blog than any other year since I started it 13 years ago. What I still haven't done, and I guess I'll try to do this year, is post an entry in all 12 months of the year.

My general goal remains what it was last year - get back to (being prepared for) operating sessions by the New England Railroad Prototype Modeler's Meet. Being at the beginning of June I think that the chances are pretty decent that the meet will happen this year. So this isn't really a set of new goals, but just a check to see where I am.

As I finalize (again) the layout, I also want to get a track plan for the website completed. In addition, the version of Google Sites that I built my site on will be retired this year. I've already started migrating the site to the new Sites, but may go to a different platform. While I have built a number of websites, I don't particularly enjoy the process and maintenance required, and I'm willing to sacrifice some flexibility for something that's easy to use. I'd rather spend the time working on the layout or content for the site, rather than designing the site itself. Also, it's free.

On the layout itself, I need to:
  • Complete a few modifications on the trackwork, up top, but also in staging.
  • Drop feeders. There are a lot of these to do now.
  • Complete swing bridge for bulk tracks
  • Build the coal trestles for Russwin, Stanley, and Stanley Svea
I'd also like to complete everything from the rails down:
  • Ballast/ground cover
  • Paint/weather the rail
  • Line Poles
  • Signs
  • Roads
I also need to complete some work in the basement itself:
  • LED lights for the Whiting Street Yard room, and replace the fluorescent fixtures in the main room
  • Install layout lighting
  • Complete drop ceiling 
Then I need trains to run:
  • Complete cabooses
  • Complete at least one years' worth of motive power
  • Complete passenger cars (that I can)
  • Complete simplified waybills for initial sessions
  • ProtoThrottles - I'm planning on at least two, maybe four
I also hope that by the prototype meet I'll have the freight house in place too. That will be the first major structure, although I have a few others in progress as well. While ops sessions resume in the middle of the year, structures will be the next major priority, along with completing more motive power. I also have a lot of rolling stock in progress, but I expect that I will start ramping that up in the middle of the year as well. Santa brought me a new compressor, so it's also probably time I start learning how to airbrush properly...

Monday, January 4, 2021

Designing Operations for Paul's Layout Part I - Setting the Stage

Happy New Year! 

One of the reasons why I blog is because I figure if I've come across something that interests me, that somebody else might find it of value as well. Recently Paul, a fellow New Haven modeler in N-scale, saw one of my clinics on operations and reached out to see if I could help with setting up operations on his layout. Of course I'm happy to. This will be a short series of posts on designing operations for Paul's layout.

This ended up being a very interesting exercise, because the layout is complete and fully scenicked. So there won't be any changes to the layout itself. They have recently downsized, so finding a place for his O-scale models was out. In the end, the best space he could find was the laundry closet. So N-scale it is.

Here's a panorama of the entire layout:


And a closer look in sections:




As you can see, the layout is a dogbone, with a yard built between the two sides. There's a single industry at either end, and regardless of the direction, one is trailing point and one is facing point. There are also two tracks for an engine house.

An initial reaction might be that there is very little to work with. A single industry to work in each direction, one runaround, and four yard tracks. I would have liked to see an actual yard lead, instead of having to use the main.

I'm on a lot of Facebook Groups, and I see a lot of 4'x8' layouts, most of which obviously consist of one or more loops, with some industries or yard tracks in the middle. And I see a lot of other folks with the opinion that they can't be operated, or at least not prototypically. 

While you can certainly plan ahead for a layout that will be designed specifically for operations, I'm also not going to put down somebody's efforts and layout.  Heck, my layout isn't even running right now, and I barely have any scenery after a decade of building it. Who am I to judge?

I'd go so far to say that with a well designed operating scheme, you can make a layout feel more prototypical, even when limited to a loop in a small space. So can I design a relatively prototypical operation with this layout? I think so. I'm going to try anyway.

Getting Started

The first thing I needed to get a handle on here was what options we have for just running trains. The loop is what threw me, since I'm not used to working with that design. At least not since high school, and I wasn't doing any operations then.

Obviously a train can run in either direction around the loop. It would only be able to service one of the industries, unless it uses the runaround to handle the facing point switch. Trains that start running westbound (left on the North Main Line) can service the New Haven Siding, then use the Yard Track as a reversing loop, so they can service the Boston industry.

Next I have to get a handle of what I'm trying to design. The layout is in a closet, and it's DC. So I'm going to start with the assumption it's a single-operator layout.

He has a few blocks so he can park trains if needed while running trains in other sections. That will provide some flexibility. We might need to create additional blocks as we operate the layout, we'll have to see. 

He's got a passenger train, a freight train, and several additional locomotives. 

But servicing 1-2 industries doesn't do much and would be a very short operating session. Plus, it doesn't utilize the yard much. What can we do with that?

The Yard Lead also forms a reverse loop on the right side (labeled Boston) on the layout, but it only works in one direction. Once you've reversed the train, you can't reverse it back without a runaround move.

Labeling the Tracks
The only concern I have to start is that the front and back main line tracks are both labeled with east to the right. But since it's a loop, the front will be the reverse of the back. Because of the orientation of the yard, I will use the rear (North) main as the main line. So to the right on the rear track is east, to the left is west. When trains are running, the front will be the reverse. Note that I'm also eliminating the south/north designations, we'll just be talking railroad east and west.

That should be enough to get started. Next time we'll look at what I can come up with for actual operations.

Thursday, December 24, 2020

Operations - It's in the Details

I've been chatting with Ronald J Hall, one of the editors (along with Robert Wuchert, Jr) of three volumes of Memories of the New Haven, published in 1985-6. These are excellent books, that collect a series of stories and information from such sources as Along the Line, which was a New Haven Railroad periodical. 

The entire series of Along the Line is available online at UCONN digital collections here as I've mentioned before.

Anyway, he's been sending a number of articles he's transcribed or scanned, and this is one of them. 

While the story itself is great, I'm always looking for sources from the era that clarify things, particularly about operations. Any publication by the railroad itself is a great option. And there was one particular paragraph that jumped out at me in this article that is extremely useful for Chris and I as we further refine our operations (and not just because it was in New Britain):

"Our first stop was New Britain where nine cars were left.  A message was handed to the engineer before we pulled out.  By a message is meant a written order telling what to do at the next stop.  This one informed the engineer to pick up three cars at Plainville."

It may not seem like much, but remember that we are modeling an era prior to radios and cell phones. Work at each town won't necessarily be known when a train leaves the yard for a run. We know that they often receive such instructions when they reach town. But this confirms that they also receive orders as they are known, as I suspected.

As should be obvious, my approach to modeling is wholistic. Part of what I'm modeling is Operations, and like your scenery, structures, locomotives and rolling stock, it's often the little details that make the difference. This provides something of interest while operating, it highlights that this is pre-radio railroading, and serves as another tidbit of information that crews can learn about operations on the prototype simply by operating on your layout. 

This isn't the only detail that I found useful in this simple story of a reporter going for a cab ride, but I'll let you find what is of interest to you. Part of my goal is for experience of operating my layout to evoke the actual experience of operating on the prototype, and articles like this help me understand better how they operated back then.

--

BRISTOL (CONN.) PRESS REPORTER TAKES ENGINE TRIP

FROM HARTFORD TO MAYBROOK

 By Clarkson S. Barnes

A wave of the hand.  Two blasts from the whistle.  A slow chug, chug and the long train is off.

The scene is the Hartford freight yard on a Saturday morning not so long ago.  The time is 6:45 and the train is BO-5 a through freight from Boston to Maybrook, N.Y.

All of this is not so remarkable in itself.  The same scene takes place every morning at practically the same time.  But on this particular morning there were two passengers on board to whom the wave of the hand and blasts of the whistle meant a great deal.

One of these passengers was Leslie H. Tyler, special representative of the New York, New Haven and Hartford Railroad.  The other was the writer of this article.

Probably every boy or girl, sometime or other, has had the desire to ride in an engine, to ring the bell, to blow the whistle, to feed the fire and more than all of these, to hold the throttle.

With what longing eyes did we watch a locomotive as it started out from the station or gaze in open-mouthed wonder as a long train passed swiftly by at some crossing.  “Oh gee, if only I could be up there some time and really make her go,” we used to say.

Leaving Hartford Station

The wish to ride in a locomotive always stayed with me though perhaps the boyish glamour disappeared along with other youthful fancies.  Nevertheless, one person on BO-5 felt as though something pretty big were about to happen when the huge locomotive got under way that Saturday morning.

Slowly she pulled her train of 45 cars off the siding and onto the main line.  Through the tunnel under Main Street she chugged with smoke pouring into the cab.  Then the Hartford station was passed and BO-5 was on her way for sure.

The engine gathered speed once she hit the straight-away and soon was rolling along at a fair rate.  The engineer, Bill Barber and Fireman Bill Dow, were real railroad men.

Mr. Barber has been in the service of the New Haven road for 39 years.  It happened that the day of the trip was his 62nd birthday.

Our first stop was New Britain where nine cars were left.  A message was handed to the engineer before we pulled out.  By a message is meant a written order telling what to do at the next stop.  This one informed the engineer to pick up three cars at Plainville.

One of the Big Engines

Our engine was 3550, one of the ten largest locomotives on the New Haven system.  This is the regular engine for BO-5 and consequently both engineer and fireman are well acquainted with her and could sing her praises.

The automatic stoker saves the fireman from shoveling except at times when wants to place coal in certain places in the fire box.  A water heater near the front of the engine heats the water so that warm water rather than cold passes into the boiler.  So many valves and pressure gauges stare you in the face that the cab looks more like a Chinese puzzle than anything else to one un-accustomed to its intricacies.  Bill Dow, however, had no trouble manipulating the valves.

The symbols BO-5 refer to the starting point and destination of the train.  B refers to Boston and O is the symbol for Maybrook.  Such symbols are used on the all through freights on the New Haven.  The way the initials are placed shows the direction of the train.  Thus the corresponding train to BO-5 is OB-6.

When we left Plainville, I began to get real excited.  We were nearing Bristol, but in what a different way than generally.  I screwed up my courage and asked Bill Barber whether I might blow the whistle. “Sure,” he said. “Go ahead.”

How To Blow The Whistle

I reached over and started to pull down the lever, thinking the whistle would blow directly.  No sound.  Then I pulled a little more.  This time there was more of a squeak than a whistle.  “Pull,” yelled Bill.  Meanwhile the others in the cab were having a great laugh.  Finally I managed to get a good hold and pulled down with all my might, two longs and two shorts.  The next two crossings I used both hands and went at it with a vengeance.  There was no difficulty in hearing the whistle this time.

Soon we pulled into Bristol. I jumped off at the station and waited there while the engine crew switched 11 cars for the local yards. When the engine backed down I hopped on again and in a few minutes we left dear old Bristol far behind.

Waterbury was our next stop.  On the outskirts a collie ran out beside the train.  Bill said that this dog greets their train every day and runs along beside them, barking in great glee.  Here we left our whole train except the hack and one freight car.  “Hack” is railroad vernacular for caboose.  Mr. Tyler who had been riding in the caboose came up to the engine along with our Conductor George Whalley, brakeman, Mark Bourgeois, and flagman Ted Wiemer.


We left Waterbury at just 10 o’clock with a load of 2,785 tons, 75 cars.  We had a “double” out of Waterbury, that is to say two engines.  The second engine, 3105 was in the middle of the train.  The rea-son was the big grade out of Waterbury.

Single Track For A Ways

The road is single track all the way to Hawleyville and curves so much that only now and then could we catch sight of the “hack.”  The scenery is very pretty along this stretch of the route.  Soon after crossing the Housatonic at Sandy Hook we passed through a short narrow tunnel.  Bill told us to be sure to hold our handkerchiefs.  It’s a good thing for the heat and smoke were terrific.  If that tunnel were any long, we would have been stifled for sure.

Before going into the main line at Hawleyville, Mark had to call up the station agent to see whether it was all right to throw the switches.  Nothing was coming so we were given the right of way.  At Hawleyville we set off 23 cars of crushed stone.  3105 also left us here, returning to Waterbury dead-head.

After leaving Hawleyville the fire for the first and only time on the trip went low.  It took some clever manipulation and constant shoveling on Bill’s part to bring her back.  Soon, we were off to Danbury.  Here Mr. Tyler and I had our dinner while the crew did some switching.  These railroad men have no time to take off for food.  Their eating has to done along the line whenever they can see a chance to grab a bite.

Soon after leaving Danbury, we passed the Fair Grounds.  Not far from here Bill showed me where he hit an auto truck and shunted it into a little creek.  We crossed into New York State before long.  One of New York City’s huge reservoirs lies near the tracks.

We Take A Message On The Fly

By the time we reached Brewster our train was rolling along at a good clip.  Here, a message was handed to us on the fly.  To do this, the brakeman leans out from the cab and crooks his arm.  The message is attached to a three cornered stick which the station agent holds.  The brakeman catches the stick on his arm, takes off the message and throws the stick to the ground to be used next time, the whole transaction being done in the twinkling of an eye.

Not far from Brewster, Bill pointed out to us where a powder car blew up in a wreck last year, killing four men.  Houses were shattered and tress blown over.  Some of the damage has not yet been repaired.

Whaley Lake is a beautiful spot.  The track goes along beside it for nearly a mile.  About five miles further one of the most magnificent views of the whole journey was revealed.  Suddenly we emerged from a pass in the hills and could see spread out before us the whole panorama of Dutchess County with its beautiful farm lands, sparkling brooks, gently sloping hills and in the distance the majestic Catskills.  It was an entrancing moment.

We rolled downhill practically ten miles to our next stop.  Hopewell Junction, were we got coal and water and did about half an hour’s work.  We waited at Hopewell for 3227 and 3221 to pass us going west.  The orders for this procedure we received at Brewster.

We stayed for nearly an hour, from 2 until quarter of 3, so Les and I had a chance to stretch our legs.  3227 was directly in back of us.  In fact it had to stop when we took the siding.  We started to do our switching before 3221 showed up so this train also had a short wait on our account.

It wasn’t long after 3221 left us before we were on our way again.  Soon we reached Poughkeepsie. “Over there lies Vasser College,” said Bill Dow.  I evinced much interest.  “Vasser College?” I reiterated.  “Yes,” he said, “and it’s some school too.  Girls go there from all over the world.  We catch sight of some of them now and then.”

The Majestic Hudson

The big Poughkeepsie Bridge over the Hudson River soon loomed into view.  This bridge is 212 feet above mean high water mark and it surely looked it from the cab of the engine.  The bridge is single track.  We barely crawled.  The maximum speed over the bridge is 12 miles an hour.  Far below were the tracks of the New York Central, the streets of Poughkeepsie, the waterfront and the boats on the river.

The Great Moment Arrives

For just a few minutes Bill Barber allowed me to sit in his seat with my hand on the throttle, though he stayed right alongside, taking no chances.  I was finally driving an engine.  I could hardly believe my eyes but there I was, sure enough.  It was a straight stretch of track and the train was running nearly forty when I took her.  My left hand was on the throttle and my right on the sill of the cab.  I tried to appear as much like an engineer as possible.

When we came to a crossing, I blew the whistle and didn’t have to ask how this time.  Bill also showed me how to ring the bell.  This is not done by pulling a cord, but instead a little valve is turned which causes an air pump to push the bell up and down.  The bell rings constantly until the valve is shut off.

Bill resumed his seat as we came to a gradual downgrade and before long BO-5 was rolling along at fifty.  “Have to ease her off a bit,” yelled Bill.  This is done by pushing in the throttle.  You can’t do it all at once, but rather notch by notch.  It requires a good bit of elbow grease to move the throttle.

Gradually Bill pushed the throttle way back.  The train coasted under her own momentum for a number of miles, just as easily as a little go-cart coasts down the street.  It was great to look around and see the huge train of seventy-five cars all following so easily after the engine and knowing that for the time being, it was “your” train.

There is a big grade for a short distance after we cross the bridge, then it is practically a straight route 40 miles to Maybrook.  The country on the west side of the Hudson is much different from that on the east side.  The land is rolling with now and then an occasional hill.  It is all fruit growing country.  Vineyards stretch along for miles and there are numerous orchards of apple and peach trees.  The fruit growers in this section join together to form “Fruit-growers Co-operative Associations,” thus being able to obtain better prices for their products.  Bill Dow stated that this was one section where farmers made some money.

The End Of The Run

“We’re coming into Maybrook now,” said Bill a little later.  I thanked Bill for the big treat he had given me and told him that one of my lifelong ambitions had been attained.

Looking down the track I could see the huge freight yards of the Maybrook terminal.  We stopped before we reached the sidings so as to find out on what track to pull in.  Seven was the one we were told to take and slowly Bill pulled BO-5 onto the track.  The long train had reached her destination.  Soon the cars would be sent over the hump and distributed, later to be made into trains for the other railroads out of Maybrook.

After she had left her train, 3550 started for the roundhouse.  Her day’s work was done.  It was just 5 o’clock and according to Bill, we had made good time.

It was the end of the road and my train ride was over.  It was a real trip and there was much to be learned beside just the fun.  It taught me more about the railroad than I had ever known before.  How intricate are its workings and what a number of details there are to be looked after.  Think of all the towns and cities along the way that are served each day by this one train, and then consider all the trains on the system, and you can see how closely linked the railroad is with our daily life.

I became acquainted with the railroad men as I had never done before and they were as fine a bunch as I had ever met.  It was an experience that will never be forgotten.

ALONG THE LINE – OCTOBER, 1928